My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1005
>
1600 - Food Program
>
PR0546582
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 11:05:08 AM
Creation date
9/13/2022 11:00:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546582
PE
1623
FACILITY_ID
FA0026424
FACILITY_NAME
UPSCALES CATERING LLC
STREET_NUMBER
1005
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
AVE
City
TRACY
Zip
95304
CURRENT_STATUS
01
SITE_LOCATION
1005 E PESCADERO AVE STE 131
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Kitchen equipment spec sheets. We need to make sure that the equipment <br />is ANSUNSF certified. Attached <br />Gas Range - Cooking Performance Group S36 -N Natural Gas 6 Burner 36" Range with <br />Standard Oven - 210.000 BTU <br />Sink - Regency 88" 16 -Gauge Stainless Steel Three Compartment <br />Commercial Sink with Galvanized Steel Legs and 2 Drainboards - <br />16" x 20" x 12" Bowls. (attached). <br />Prep Sink - <br />Steelton 38 3/4" 18 -Gauge Stainless Steel One Compartment Commercial Sink with 1 <br />Drainboard - 18" x 18" x 12" Bowl <br />Gas Cooktop- Cooking Performance Group HP636 6 Burner Gas Countertop Range / Hot <br />Plate - 132.000 BTU <br />2) Plans state an epoxy flooring. Material specifications? Concrete <br />Will this flooring have a 3/8" minimum radius base cove? See Appendix D. <br />3/8" rounded. <br />3) Specs/size of hot water heater? Page 3 of Plans. 85 Gallon 300,000 BTU. <br />4) There is a prep sink listed on page 10 (equipment list). Location? Page 1 <br />of plans. Prep sink on the right front wall outside of refrigerator/ <br />freezer space. <br />5) Walls and ceilings finishes state stucco. This is not an approved surface. <br />The finish shall be smooth, cleanable, durable and nonabsorbent. Walls <br />finished per requirements based upon the Health Department <br />requirements and guidance. Walls are currently finished in a <br />smooth nonabsorbent paint (photos attached). <br />6) Will you be providing any shelving for the storage of cold and dry storage? <br />Movable racks on wheels for storage. <br />7) Will the 3 -comp sink and 1 -comp prep sink waste drain into a floor sink? <br />The plans state an existing floor drain, but it will need to indirectly <br />drain into a floor sink. Floor sink Page 3 of plans. Near the hand <br />wash sink and near the water heater with hot and cold water lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.