Laserfiche WebLink
4.2 Description/discussion of any existing and/or potential groundwater <br />contamination issues in the general location of the site: Description of existing or potential <br />groundwater contamination issues in the general location of the site are referred to in Section 4.2 <br />of the Soil Suitability Report prepared by Dillon & Murphy (See Appendix). <br />4.3 Description of the current use of groundwater at the site and of the future expected use <br />of groundwater as related to the proposed development project: Based on the most recent <br />results from San Joaquin's Flood Control and Water Conservation District" report on <br />groundwater from Spring 2021, the estimated depth to groundwater was determined to be <br />approximately 150 feet below the surface. This was verified with the California Department of <br />Water Resources Water Data Library. The results of the historic depth to ground water show <br />that the relative depth has not changed drastically throughout the years. The proposed use of <br />groundwater is not expected to change with this project. See Appendix for the site's depth <br />groundwater tables and diagrams. <br />5.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO <br />GROUNDWATER <br />5.1 Description of all current off-site sources of nitrate to soil and groundwater in the general <br />up gradient area and the contribution of nitrate load from these sources to the project site: <br />Current off-site source of nitrate to soil and groundwater in the general up gradient area and the <br />contribution of nitrate loads are agriculture and neighboring sites with septic systems. <br />5.2 Description of impact of rainfall contribution of nitrate load to the project site: <br />The impact of rainfall contribution on the project site was completed to determine the nitrate load. <br />The average monthly precipitation and evapotranspiration are required to calculate the site nitrate <br />load. These two values are used to estimate the deep percolation. The deep percolation is <br />estimated by analyzing the difference between the monthly average precipitation and the <br />evapotranspiration, when the evapotranspiration exceeds the monthly average precipitation. These <br />calculations are attached in the Appendix. <br />The data for the potential evapotranspiration water was obtained from the California Irrigation <br />Management Information System (CIMIS). The project is located within an area designated as <br />Zone 12. Based on the values for this area along with the average monthly precipitation values <br />obtained from the Western regional Climate Center for the Linden region, an estimate of the deep <br />percolation of rain for the project was determined. <br />The results for the deep percolation at the site were 0.06 in./year for parcel 1 and 0.07 in/year for <br />parcel 2. The nitrate concentration is estimated to be about 1 mg/L-N. (Hantzche and Finnemore, <br />1992). <br />5.3 Description of all current on-site sources of nitrate to soil and groundwater and the <br />contribution of nitrate load from these sources to the project site: <br />The only source of nitrates existing are the ones derived from any agriculture use. <br />2 <br />