Laserfiche WebLink
PROJECT : Ahern Road Fueling Station February 28 , 2022 <br /> Job No : 20-544 Ross P . Shoat Civil Engineer <br /> EQUIPMENT LIST <br /> This list is not comprehensive, and it is up to the supplier and contractor to double check and verify this list and all extras <br /> such as pipes fittings and backfill materials. <br /> 1 . The Septic Tank dimensions on the plan are based on a Darco 20,000 Gallon two Compartment Fiberglass <br /> tank . ( Any substitution must be of the same or nearly the same physical dimensions to meet all setback <br /> requirements and elevations per the plan . ) <br /> 2 . All other tanks are as follows and should be sourced from appropriate suppliers . They are to be guaranteed <br /> watertight . <br /> a . 1 - 1,000 gallon Grease Interceptor tank <br /> b . 1 - 8 .000 gallon Single Compartment Pre-Anoxic tank <br /> c. 1 - 5,000 gallon Single Compartment Primary Recirculation Tank <br /> d . 1 - 4,000 gallon Single Compartment Post Anoxic Tank <br /> e . 1 - 2,500 gallon Single Compartment Secondary Recirculation Tank <br /> f. 1 - 5,000 gallon Single Compartment Final Discharge/Dosing Tank <br /> The following equipment is manufactured BY Orenco® Systems, Phone : 800-348-9843, FAX : 541459-2884 <br /> NOTE : At time of ordering it is important to request that all catalog numbers be double checked for errors , <br /> correctness and compatibility to design Supplier should also double check design for all equipment needed . <br /> 3 . Control Equipment <br /> 1 - Control Panel (TCOM ) CUSTOM Control Panel (Voltage to match customer specs) <br /> 4. Equipment for the Leach Field Lines . <br /> a . 21160' - of Filter Fabric ( LIFF27 ) Use at leach lines <br /> b . 540 - Orifice Shields ( OS125 ) Use at leach lines, 1 . 25" size <br /> c. 60 - Ball Valves, 1 . 25" size ( VLT1250S ) Use at each Leach Line for flow adjust and flushing <br /> d . 30 - Flushing Assemblies ( SEA125C) At end of each Leach Line <br /> e . 60 - Valve Boxes (VB7 ) At each end of Leach lines ( ball valves and Flushing) <br /> 5 . Equipment needed for the Primary treatment Assembly : <br /> a . ) 5 - AX100 pods <br /> b . ) 4 - pumps for dosing AX100 Pods ( PF7510) <br /> c. ) 1 — 3 Float Assembly (to match TCOM panel ) <br /> d . ) 1 pump for feedback to Pre-Anoxic Tank ( PF300512 ) <br /> e . ) 1 RO float assembly for Anoxic return pump <br /> f. ) 1 — 5 pump flow inducer tower ( FIT) <br /> g. ) 5 - 2" Discharge Assemblies ( HV200 - BXQPR ) <br /> h . ) 1 - Splitter valve to post-Anoxic tank ( RBV) set at 80% of tank volume <br /> i . ) 1 - Liquid Chemical Feeder for Alkalinity ( LCF 3060- BG ) <br /> j . ) 1 - Vent Fan (AXVFACF — Green ) <br /> k. ) 1 - Secondary vent (AX-Vent Kit) <br /> Page 7 Of 11 <br />