My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085194
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
SR0085194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:01:54 PM
Creation date
10/4/2022 10:07:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085194
PE
2903
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA, INC. FORMER NESTLE USA INC. FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904012
ENTERED_DATE
4/26/2022 12:00:00 AM
SITE_LOCATION
230 INDUSTRIAL AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D FT <br /> 7. An operation and maintenance phase for the treatment plant with a duration of 10 <br /> to 30 years,and <br /> 8. A site restoration phase with equipment removal,decommissioning and restoration <br /> of Property to match surrounding conditions. <br /> WHEREAS, in order to complete the Work, the School District agrees to allow access for <br /> NUSA and its authorized agents and subcontractors to conduct the following activities,alone or in <br /> combination, (collectively,the"Activities")over the course of completing the Work: <br /> 1. Site survey: Perform a survey of existing infrastructure on the Property which <br /> is necessary to finalize the design of a Groundwater Remediation System and <br /> delineate the treatment plant area. This activity would likely involve having a <br /> land surveyor crew and utility locating crew on the Property for up to ten days. <br /> 2. Well drilling, installation,testing and modification: <br /> a. Modify existing irrigation well RPS-1, to be used for groundwater <br /> extraction, which may include wellhead, well screen and depth <br /> modifications. This activity would involve several days of construction <br /> in the vicinity of RPS-I along with drilling equipment. <br /> b. Install two injection wells(IW-1 and IW-2)at the approximate locations <br /> shown on Exhibit A. This activity would likely involve approximately <br /> 5 days of drilling and construction in the vicinity of IW-1 and IW-2, <br /> followed by 5 days of well development and testing. <br /> 3. Construction of groundwater treatment plant: The groundwater treatment plant <br /> is currently planned to be constructed at the area shown in Exhibit A; and <br /> duration of construction is anticipated to occur over a 8 to 10 week period and <br /> would likely involve a construction crew, small excavation and concrete <br /> forming equipment,trucks, forklifts and potentially a small crane,among other <br /> equipment. The treatment system will likely include the following as shown in <br /> Exhibit B: <br /> a. An electrical service, separate from the School District service, <br /> b. A concrete pad and ramp enclosed by a fence,with an adjacent storage <br /> shed housing a program logic controller with internet connection, an <br /> electrical panel and maintenance tools, <br /> c. A piping manifold and above ground pipe rack with associated valves, <br /> sensors and electrical controls, <br /> d. Two 10,000 pound liquid phase granular activated carbon (GAC) <br /> vessels with associated bag filters and transfer pumps, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.