HALEY&ALDRICH,INC. <br /> '�� 17th Street <br /> Suite <br /> Suite 700 <br /> H2iSNOakland,CA 94612 <br /> 510.879.4544 <br /> 23 February 2022 <br /> File No. 0130215-007 <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive,#200 <br /> Rancho Cordova,California 95670 <br /> Attention: Amber Ginorio, GIT <br /> Subject: Revised Well Installation Work Plan <br /> North Area Groundwater Interim Remedial Action <br /> Ripon, California <br /> Dear Ms. Ginorio: <br /> On behalf of Nestle USA, Inc. (Nestle), Haley&Aldrich, Inc. (Haley&Aldrich) has prepared this Revised <br /> Well Installation Work Plan (Revised Work Plan)to describe the planned installation of one groundwater <br /> extraction well and two groundwater injection wells for replenishing the aquifer with treated water as <br /> part of the implementation of the North Area groundwater Interim Remedial Action (IRA). This IRA is <br /> being implemented to remediate groundwater containing trichloroethene and cis-1,2-dichloroethene in <br /> an area northwest of the former Nestle facility located at 230 Industrial Avenue in Ripon, California (Site; <br /> Figure 1) and north of the City of Ripon wastewater treatment plant (WWTP; Figure 1);this IRA area is <br /> referred to as the "North Area" hereafter, and is also shown in Figure 1. <br /> Haley&Aldrich previously submitted a Well Installation Work Plan (Work Plan)to the Central Valley <br /> Regional Water Quality Control Board (Water Board) on 2 November 2021.The Water Board responded <br /> with comments on the Work Plan in a letter dated 23 December 2021, and Haley&Aldrich submitted a <br /> letter responding to the Water Board comments on 22 February 2022. <br /> The initial Work Plan proposed installing an extraction well (RPS-3) as a combined Cl-and C2-Zone well. <br /> During the engineering design process subsequent to submittal of the Work Plan, Haley&Aldrich <br /> determined that it would be advantageous to retain existing well RPS-1 as a C1-Zone extraction well and <br /> install RPS-3 as a C-2 Zone extraction well.This will allow for the extraction rate in each Zone to be <br /> adjusted independently based on groundwater conditions and field observations. Haley&Aldrich <br /> discussed this change in construction with the Water Board during a virtual meeting on 10 January 2022. <br /> This Revised Work Plan incorporates the changes above and discusses the well installation methods. <br /> www.haleyaldrich.com <br />