My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085194
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
SR0085194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:01:54 PM
Creation date
10/4/2022 10:07:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085194
PE
2903
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA, INC. FORMER NESTLE USA INC. FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904012
ENTERED_DATE
4/26/2022 12:00:00 AM
SITE_LOCATION
230 INDUSTRIAL AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board-Central Valley Region <br /> 23 February 2022 <br /> Page 4 <br /> WELL SAMPLING <br /> Following well development,groundwater samples will be collected from extraction and injection wells <br /> and submitted to a California-certified analytical laboratory for analysis of the following: <br /> • Volatile organic compounds using United States Environmental Protection Agency(USEPA) <br /> Method 8260B. <br /> • Alkalinity using Standard Method (SM) 2320B. <br /> • Title 22 metals and major cations(calcium, magnesium,sodium, potassium, iron, aluminum, and <br /> manganese) using USEPA Method 6010. <br /> • Major anions (nitrate, nitrite, sulfate, chloride) using USEPA Method 300.0. <br /> • Uranium using USEPA Method 908.0. <br /> • Total dissolved solids using SM 2540C. <br /> • Other water quality parameters (temperature, pH, specific conductance,oxidation-reduction <br /> potential, and turbidity)will be measured in the field during sampling activities. <br /> Schedule and Reporting <br /> It is anticipated that the extraction and injection wells will be installed in the first half of 2022, <br /> contingent upon timely approval of permits and subject to driller availability.The field methods, <br /> construction details, boring and well completion logs, and sampling results will be presented in the <br /> completion report for the IRA. <br /> Please do not hesitate to call if you have any questions or comments. <br /> Sincerely yours, <br /> HALEY&ALDRICH, INC. <br /> Jennifer Galvin, PG Miao Zhang, PE <br /> Technical Specialist NAL C fo! Senior Technical Specialist <br /> 79Q2� <br /> Peter Bennett, PG CHG 1%* EXP.� <br /> Principal Hydrogeologist !'. Q <br /> CA PG#7902, CA CHG#921`` �Q�\ <br /> f OF <br /> '%BNICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.