My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085194
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
SR0085194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:01:54 PM
Creation date
10/4/2022 10:07:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085194
PE
2903
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA, INC. FORMER NESTLE USA INC. FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904012
ENTERED_DATE
4/26/2022 12:00:00 AM
SITE_LOCATION
230 INDUSTRIAL AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPS-3 <br /> ABOVE GROUND LOCKING STOVE PIPE <br /> GROUND SURFACE <br /> APPROXIMATE ELEVATION 62.5 FEET NAVD88 <br /> NEAT CEMENT GROUT <br /> 6"SCHEDULE 80 PVC WELL CASING <br /> BOREHOLE DIAMETER:10" <br /> i <br /> i <br /> II <br /> TOP OF SEAL:153 FEET BGS TWO FEET TRANSITION SEAL(HYDRATED BENTONITE) <br /> TWO FEET TRANSITION SAND <br /> TOP OF SCREEN:160 FEET BGS- <br /> #3 FILTER SAND(OR EQUIVALENT) <br /> 6"STAINLESS STEEL SCREEN <br /> 0.030"SLOT SIZE <br /> BOTTOM OF SCREEN:180 FEET BGS <br /> TOTAL DEPTH:184 FEET BGS <br /> SILT SUMP(PVC) <br /> REVISED WELL INSTALLATION WORK PLAN NORTH <br /> NOTES HkR'CH AREA GROUNDWATER INTERIM REMEDIAL ACTION <br /> 1.CONSTRUCTION DETAILS PRESENTED ARE PROPOSED RIPON,CALIFORNIA <br /> AND MAY BE ADJUSTED BASED ON FIELD CONDITIONS. <br /> PROPOSED EXTRACTION WELL <br /> BGS=BELOW GROUND SURFACE CONSTRUCTION DETAILS <br /> PVC=POLYVINYL CHLORIDE <br /> FEBRUARY 2022 FIGURE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.