My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11662
>
4200 – Liquid Waste Program
>
PR0420091
>
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 4:52:30 PM
Creation date
10/5/2022 4:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
O & M MANUAL - WEST LANE MOBILE HOME PARK
RECORD_ID
PR0420091
PE
4242
FACILITY_ID
FA0000277
FACILITY_NAME
IL VINETO
STREET_NUMBER
11662
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05925003
CURRENT_STATUS
02
SITE_LOCATION
11662 N HAM LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRF: NT <br />The Simple, Reliable Way to Treat Water/ <br />Wastewater <br />Severn Trent Services (STS) Models 1000 & 1001 Tablet <br />Feeders are complete, one-piece systems for highly <br />reliable disinfection of treated effluent from any sewage <br />plant having a designed capacity of up to 50,000 GPD. <br />Two tablet feeders in parallel will handle plants with <br />capacities as high as 100,000 GPD. The tablet feeder is <br />used in conjunction with SANURILO tablets, a disinfecting <br />agent that provides a chemically stable source of chlorine <br />for wastewater disinfection. <br />Two models are available. Model 1000 with a six-inch pipe <br />inlet, or Model 1001 with solid inlet end for easy field <br />adaptation to the outlets of existing plants. Either tablet <br />feeder can be installed in existing treatment plants where <br />wastewater chlorination is being added or to replace <br />troublesome, unreliable or complicated chlorination <br />systems. Either is equally suitable for factory assembly <br />into new package plants. <br />_)uperior Performance at a Lower Cost <br />Better Performance -- The entire plant flow passes <br />through the tablet feeder where thorough mixing of <br />wastewater with a controlled amount of chlorine takes <br />place. This means more effective disinfection with less <br />bacteria re -growth. <br />Low Initial Cost -- In addition to low investment in the EIC <br />Tablet Feeder, savings are compounded because no <br />pumps, mixing tanks or costly control devices are required <br />as with most other chlorination systems. <br />Simple, Low -Cost Installation -- One piece tablet feeder <br />construction requires only inlet piping. No electrical power, <br />wiring, bypasses, or other piping required. <br />Lower Operating Costs -- The tablet feeder can operate <br />up to 60 days before additional tablets are required for refill. <br />No time-consuming pre -mixing of chemicals or costly <br />cylinder handling. Adding SANURIL tablets is quick and <br />easy. No costs for electrical power or auxiliary power. <br />Maintenance -Free Operation -- No tanks, pumps, <br />cylinders, external control devices or other moving parts to <br />Teak down. System is non-mechanical, rust and corrosion <br />goof. <br />Tablet Feeder <br />Models 1000 & 1001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.