Laserfiche WebLink
AC <br />LAi <br />L� FLANI <br />INLET I <br />INLET BAR' <br />I <br />FINISH <br />All <br />n2 <br />DESIGN <br />FLOW <br />GPO <br />AERATION <br />TANK <br />VOLUME <br />EQUAL, <br />TANK <br />VOLUME <br />CLARIFIER <br />TANK <br />VOLUME <br />SLUDGE <br />TANK <br />VOLUME <br />CHLORINE <br />CONTACT <br />VOLUME <br />AiRAt10N. TANK <br />AIR BLOWERS <br />EQUAL. TANK <br />AIR SLOWER <br />11 <br />!/"A' <br />!SERVICE <br />PUMPS W/ <br />GUIDE RAILS <br />GRATING SLUDGE <br />DIVERSION <br />GALV4 PLANK STYLE VALVES <br />CFM <br />'a <br />sRlla <br />NEN MCHM n as O O /PUMP CUWC RdgS <br />RENSEP &lX�.R HGQ.£`PO'h➢1 F4R Off INE WJNi b d P8 <br />PP-18—ESC <br />- <br />16,000 <br />r <br />6,089 <br />rr. <br />4,200 <br />493 <br />5.0 <br />78 <br />1$0 20 <br />F• <br />Odic <br />��II,3 j <br />f <br />jj�x <br />11 <br />�Awlnrr �' <br />I <br />._. <br />Mill <br />O•4 <br />1 REMOTEf <br />NOTE #6 <br />. • <br />SEE NOTE #6 <br />60 DIA. EMERGENCY <br />OVERFLOW <br />E fWER • CTININEf. <br />SEE NOTE #6 <br />!E <br />(3) EACH END <br />1 <br />1'-6 <br />SERVICE HANpRAILS <br />PAINTED STEEL <br />Flow coNTROL enx <br />DIFFUSER DROPS <br />Wf HYORO—CHEK <br />DIFFUSERS <br />BLOWERS AND CONTROL PANEL TO <br />LOCATED IN BUILDING ADJACENT TO <br />THE TREATMENT PLANT <br />5'-0" � 21,_6.. <br />FLOW 5 UL5 DGE AERATION TANK <br />EQUALIZATION TANK HOLDING TANK <br />NOTES: ELEVATION VIEWwfo SIDE WALL <br />L) ALL EXTERNAL PIPING TO THE TANK IS TO BE SUPPLIED AND 4.) INCOMING ELECTRICAL POWER AND CONNECTION TO THE WIREWAY <br />INSTALLED BY THE INSTALLATION CONTRACTOR, COUPLING ON THE TANK IS BY THE ELECTRICAL CONTRACTOR, <br />2.) FOUNDATION PAD MATERIALS AND DESIGN IS DETERMINED BY 5.) ALL STEEL SURFACES TO BE PAINTED WITH A HI—BUILD EPDXOUNE <br />THE PROJECT ENGINEER AFTER SOIL ANALYSIS IS COMPLETED PAINT TNEMEC SERIES #46—H-413 O/E. SURFACE PREP AND <br />3,) MATERIALS FOR ANCHORING OF TANK TO THE FOUNDATION PAD PER PAINT MANUFACTURES RECOMMENDATIONS, <br />IS TO BE SUPPLIED BY OTHERS 6.) INSTALLING CONTRACTOR TO VERIFY FIELD CONNECTION LOCATIONS WE CM <br />CLARIFIER <br />TANK <br />PLANT <br />MODEL <br />NUMBER <br />DESIGN <br />FLOW <br />GPO <br />AERATION <br />TANK <br />VOLUME <br />EQUAL, <br />TANK <br />VOLUME <br />CLARIFIER <br />TANK <br />VOLUME <br />SLUDGE <br />TANK <br />VOLUME <br />CHLORINE <br />CONTACT <br />VOLUME <br />AiRAt10N. TANK <br />AIR BLOWERS <br />EQUAL. TANK <br />AIR SLOWER <br />11 <br />!/"A' <br />nrxxn 9Ra1G4 w ad�n to aFtae�o now Rr cct <br />m Pur cun�l tmrosrE oe tum <br />HP <br />CFM <br />HP CFM <br />sRlla <br />NEN MCHM n as O O /PUMP CUWC RdgS <br />RENSEP &lX�.R HGQ.£`PO'h➢1 F4R Off INE WJNi b d P8 <br />PP-18—ESC <br />- <br />16,000 <br />18,060 <br />6,089 <br />31395 <br />4,200 <br />493 <br />5.0 <br />78 <br />1$0 20 <br />RFV, <br />Odic <br />-- <br />CESCRIPii 4 <br />CHLORINE <br />CONTACT <br />TANK <br />CLARIF <br />WEIF <br />TROD, <br />NATOR <br />FEEDER <br />6' <br />' <br />OVER <br />3AFFLES <br />4' <br />FLANGED <br />UTLET PIPE <br />UF11NG EYES <br />5 TRANSFER TROUGH <br />11'-0° / E FIZOF W/ V -NOTCH <br />MERGENC <br />DRAIN PLUGS I OVERFLOWY <br />MAGNESIUM ANODES—/ <br />FOR )jBELOW GRADE <br />( TOTAL {6}1DE <br />FOUNDATION PAD <br />(BY OTHERS) <br />ARIFIER <br />INLET <br />DIA. SLUDGE <br />2LIFT PUMP <br />ESTIMATED <br />5HIPPlNG <br />WEIGHT <br />Hollow5827 Happy Milford, Ohio Lnj Suits ID WEST LANE MOBILE HOME PARK <br />(513) 831�1105 <br />