Laserfiche WebLink
i <br />0 <br />I <br />INLE' <br />a <br />EQUALIZATION QGRATINGSLUDGE <br />PUMPS W/ <br />GUIDEGALV <br />VICEDIVERSION <br />PLANK STYLE VALVES <br />0 <br />I <br />INLE' <br />a <br />SERI HANDRAILS <br />PAINTED STEEL <br />OW CONTROL BOX <br />I <br />(3) EACH ENDQ L <br />1 <br />1'-6„ <br />BLOWERS AND CONTROL PANEL TO <br />LOCATED IN BUILDING ADJACENT TO <br />THE TREATMENT PLANT <br />CLARIFIER <br />WEIR <br />TROUGH <br />NATOR <br />FEEDER <br />6'-9" <br />OVER <br />AFfLES <br />4'-3" <br />2 <br />IPE <br />LIFTING EYES <br />2" DIA, <br />SCUM <br />AIRLIFT <br />PUMP <br />1.7 <br />-�'- <br />W1 Viii -NOTCH <br />iTIONJ <br />1BAF1 LE DRAIN PLUGS <br />OVERFLOW - <br />FLOW SLUDGE AERAl10N TANK CLARIFIER <br />EQUALIZATION TANK HOLDING TANK TANK <br />NOTES: ELEVATION VIEWw/o SIDE WALL <br />1.) ALL EXTERNAL PIPING TO THE TANK IS TO BE SUPPLIED AND 4.) INCOMING ELECTRICAL POWER AND CONNECTION TO THE WIREWAY <br />INSTALLED BY THE INSTALLATION CONTRACTOR, COUPLING ON THE TANK IS BY THE ELECTRICAL CONTRACTOR, <br />2.) FOUNDATION PAD MATERIALS AND DESIGN IS DETERMINED BY 5.) ALL STEEL SURFACES TO BE PAINTED WITH A HI -BUILD EPDXOLINE <br />THE PROJECT ENGINEER AFTER SOIL ANALYSIS IS COMPLETED PAINT TNEMEC SERIES x/46 -H-413 0/E, SURFACE PREP AND <br />3.) MATERIALS FOR ANCHORING OF TANK TO THE FOUNDATION PAD PER PAINT MANUFACTURES RECOMMENDATIONS, <br />IS TO BE SUPPLIED BY OTHERS 6.) INSTALLING CONTRACTOR TO VERIFY FIELD CONNECTION LOCATIONS <br />PLANT DESIGN AERATION EQUAL, CLARIFIER SLUDGE CHLORINE AERATION. TANK EQUAL TANK IAT�a ADM TROUGH B OLAWfIIR TO RJON IN COT <br />MODEL FLOW TANK TANK TANK TANK CONTACT AIR BLOWERS AIR BLOWER m Ta Pur DOW WPOSnE SOLE OF TAW <br />NUMBER GPD VOLUME VOLUME VOLUME VOLUME VOLUME HP CFM HP CFM0 Iryhn RE REEQ �A � Am no c / MW %a HORNEF"M FOR OFF THE FLANT RMS <br />PP -18 -ESC 1800 5 PSI 00 18,060 61089 3,395 4,200 493 5,0 78 1.50 20 RE DATE DEsaapna+ <br />MAGNESIUM ANODES) <br />FOR BELOW GRADE <br />2'-0' (3 EACH SIDE <br />OTAL (6) <br />CHLORINE FOUNDATION PAD <br />CONTACT (BY OTHERS) <br />TANK <br />VIEW A -A <br />CLARIFER <br />INLET <br />" DIA. SLUDGE <br />AIRLIFT PUMP <br />ESTIMATED <br />SHIPPING <br />WEIGHT <br />�/�C Pollution 18,000 GPD PACKAGED WASTEWATER PLANT <br />r V 7 Control <br />Systems, Inc. <br />5827 Happy Hollow Ln, Suite IB WEST LANE MOBILE HOME PARK <br />Milford, Ohio 45150 <br />(513) 831-1165 <br />E—mall PO ConSyeQnol,com SCALE: PLOT: 3/18'=1' pRQECT N0. WOIE No. 15030 <br />„� <br />NOT DRAWING WHANS INFORMATION THAT IS PRORf�TNn TO DRANK BY: JJM DATE. 3/1 /15 SHEET IXtAWIN0 N0. <br />POLLUTION CONTROL SMW AND IS NOT TO BE M WITHOUT <br />APPROV. YADTIB! PENYSSION OF POLLUTION CONTROL StSiEus INC. CNEC1(fD BT JJM DATE, 3/1/15 1 1 OF 1 115851,I -01A <br />EQUALIZATION QGRATINGSLUDGE <br />PUMPS W/ <br />GUIDEGALV <br />VICEDIVERSION <br />PLANK STYLE VALVES <br />11 I� <br />_ <br />I' <br />II <br />�_� <br />I/ <br />/" <br />i <br />1 <br />1 1 <br />1 1 1 <br />1 <br />a <br />1 <br />, 1 1 <br />• � <br />, <br />j <br />SERI HANDRAILS <br />PAINTED STEEL <br />OW CONTROL BOX <br />I <br />(3) EACH ENDQ L <br />1 <br />1'-6„ <br />BLOWERS AND CONTROL PANEL TO <br />LOCATED IN BUILDING ADJACENT TO <br />THE TREATMENT PLANT <br />CLARIFIER <br />WEIR <br />TROUGH <br />NATOR <br />FEEDER <br />6'-9" <br />OVER <br />AFfLES <br />4'-3" <br />2 <br />IPE <br />LIFTING EYES <br />2" DIA, <br />SCUM <br />AIRLIFT <br />PUMP <br />1.7 <br />-�'- <br />W1 Viii -NOTCH <br />iTIONJ <br />1BAF1 LE DRAIN PLUGS <br />OVERFLOW - <br />FLOW SLUDGE AERAl10N TANK CLARIFIER <br />EQUALIZATION TANK HOLDING TANK TANK <br />NOTES: ELEVATION VIEWw/o SIDE WALL <br />1.) ALL EXTERNAL PIPING TO THE TANK IS TO BE SUPPLIED AND 4.) INCOMING ELECTRICAL POWER AND CONNECTION TO THE WIREWAY <br />INSTALLED BY THE INSTALLATION CONTRACTOR, COUPLING ON THE TANK IS BY THE ELECTRICAL CONTRACTOR, <br />2.) FOUNDATION PAD MATERIALS AND DESIGN IS DETERMINED BY 5.) ALL STEEL SURFACES TO BE PAINTED WITH A HI -BUILD EPDXOLINE <br />THE PROJECT ENGINEER AFTER SOIL ANALYSIS IS COMPLETED PAINT TNEMEC SERIES x/46 -H-413 0/E, SURFACE PREP AND <br />3.) MATERIALS FOR ANCHORING OF TANK TO THE FOUNDATION PAD PER PAINT MANUFACTURES RECOMMENDATIONS, <br />IS TO BE SUPPLIED BY OTHERS 6.) INSTALLING CONTRACTOR TO VERIFY FIELD CONNECTION LOCATIONS <br />PLANT DESIGN AERATION EQUAL, CLARIFIER SLUDGE CHLORINE AERATION. TANK EQUAL TANK IAT�a ADM TROUGH B OLAWfIIR TO RJON IN COT <br />MODEL FLOW TANK TANK TANK TANK CONTACT AIR BLOWERS AIR BLOWER m Ta Pur DOW WPOSnE SOLE OF TAW <br />NUMBER GPD VOLUME VOLUME VOLUME VOLUME VOLUME HP CFM HP CFM0 Iryhn RE REEQ �A � Am no c / MW %a HORNEF"M FOR OFF THE FLANT RMS <br />PP -18 -ESC 1800 5 PSI 00 18,060 61089 3,395 4,200 493 5,0 78 1.50 20 RE DATE DEsaapna+ <br />MAGNESIUM ANODES) <br />FOR BELOW GRADE <br />2'-0' (3 EACH SIDE <br />OTAL (6) <br />CHLORINE FOUNDATION PAD <br />CONTACT (BY OTHERS) <br />TANK <br />VIEW A -A <br />CLARIFER <br />INLET <br />" DIA. SLUDGE <br />AIRLIFT PUMP <br />ESTIMATED <br />SHIPPING <br />WEIGHT <br />�/�C Pollution 18,000 GPD PACKAGED WASTEWATER PLANT <br />r V 7 Control <br />Systems, Inc. <br />5827 Happy Hollow Ln, Suite IB WEST LANE MOBILE HOME PARK <br />Milford, Ohio 45150 <br />(513) 831-1165 <br />E—mall PO ConSyeQnol,com SCALE: PLOT: 3/18'=1' pRQECT N0. WOIE No. 15030 <br />„� <br />NOT DRAWING WHANS INFORMATION THAT IS PRORf�TNn TO DRANK BY: JJM DATE. 3/1 /15 SHEET IXtAWIN0 N0. <br />POLLUTION CONTROL SMW AND IS NOT TO BE M WITHOUT <br />APPROV. YADTIB! PENYSSION OF POLLUTION CONTROL StSiEus INC. CNEC1(fD BT JJM DATE, 3/1/15 1 1 OF 1 115851,I -01A <br />