Laserfiche WebLink
SECTION 13: GENERAL INFORMATION <br />B-1) To the Purchaser: <br />Congratulations! You are the owner of one of the finest pumps <br />on the market today. CP&S pumps are products engineered <br />and manufactured of high quality components. Over one <br />hundred years of pump building experience along with a <br />continuing quality assurance program combine to produce a <br />pump which will stand up to the toughest applications. This <br />manual will provide helpful information concerning installation, <br />maintenance, and proper service guidelines. <br />B-2) Receiving: <br />Upon receiving the pump, it should be inspected for damage <br />or shortages. If damage has occurred, file a claim immediately <br />with the company that delivered the pump. If the manual <br />is removed from the packaging, do not lose or misplace. <br />B-3) Storage: <br />Short Term- CP&S Pumps are manufactured for efficient <br />performance following short inoperative periods in storage. <br />For best results, pumps can be retained in storage, as factory <br />assembled, in a dry atmosphere with constant temperatures <br />for up to six (6) months. Long Term- Any length of time <br />exceeding six (6) months, but not more than twenty-four (24) <br />months. The unit should be stored in a temperature controlled <br />area, a roofed over walled enclosure that provides protection <br />from the elements (rain, snow. wind-blown dust, etc.), and <br />whose temperature can be maintained between +40 deg. F <br />and +120 deg. F. (4.4 - 49°C). Pump should be stored in its <br />original shipping container. On initial start up, rotate impeller <br />by hand to assure seal and impeller rotate freely. If it is <br />required that the pump be installed and tested before the long <br />term storage begins, such installation will be allowed provided: <br />1.) The pump is not installed under water for more than <br />one (1) month. <br />2.) Immediately upon satisfactory completion of the test, <br />the pump is removed, thoroughly dried: repacked in the <br />original shipping container, and placed in a temperature <br />controlled storage area. <br />B-4) Service Centers: <br />For the location of the nearest Barnes Service Center, check <br />your Barnes representative or Crane Pumps & Systems, Inc., <br />Service Department in Piqua, Ohio, telephone (937) 778-8947 <br />or Crane Pumps & Systems Canada, in Brampton, Ontario, <br />(905) 457-6223. <br />SECTION C: INSTALLATION <br />C-1) Location: <br />These pumping units are self-contained and are recommended <br />for use in a sump, lift station or basin that is free of hard debris <br />like gravel, stones, sand or earth. The sump, lift station or <br />basin shall be vented in accordance with local plumbing codes. <br />This pump is designed to pump sewage, effluent, or other <br />nonexplosive or noncorrosive wastewater. and shall NOT be <br />installed in locations classified as hazardous in accordance <br />with the National Electrical Code (NEC), ANSIINFPA 70 or the <br />Canadian Electrical Code (CEC). Never install the pump in a <br />trench, ditch or hole with gravel, stones, sand, or earth bottom; <br />the legs will sink into the dirt and the suction will become <br />plugged, or the pump impeller will be damaged. <br />C-1.1) Submergence: <br />It is recommended thatthe pump be operated in the submerged <br />condition and the sump liquid level should never be lower than <br />the top of the pump. (see Fig. 2) <br />FIGURE 1 <br />ECOMMENDED <br />UWA= 2GENCE <br />LEVEL <br />C-2) Discharge: <br />Discharge piping should be as short as possible. Both a check <br />valve and a shut-off valve are recommended for each pump <br />being used. The check valve is used to prevent backflow <br />into the sump. Excessive backflow can cause flooding <br />and/or damage to the pump. The shut-off valve is used to <br />stop system flow during pump or check valve servicing. <br />Barnes Pumps supplies a Stainless Rail Package for <br />the 2" models and also a variety of 2" and 3" break -away <br />fitting discharge systems (see Fig. 1) designed to allow the <br />submersible wastewater pump to be installed or removed <br />without requiring personnel to enter the wet well. Contact your <br />local Barnes Pumps distributor for complete details. <br />Stainless Rail Package (Not Shown) - The package system <br />comes complete and ready to place into the ground as outlined <br />in the project specifications- The moveable portion of the Break <br />Away Fitting (BAF), check valve, piping and guide bracket <br />comes assembled on the pump along with the lifting cord. <br />Insert pump bracket and moveable portion of BAF into the <br />guide channel and lower pump into basin (DO NOT DROP). <br />Now connect power and control cords to the junction box or <br />control panel depending on system design. <br />C-3) Liquid: Level Controls: <br />The level controls are to be supported by a mounting bracketthat <br />is attached to the sump wall, cover or junction box. Cord grips <br />are used to hold the cords in place on the mounting bracket. <br />The control level can be changed by loosening the grip and <br />adjusting the cord length as per the plans and specifications. <br />Be certain that the level controls cannot hang up or foul in it:s <br />swing and that the pump is completeiy submerged when the <br />levei control is in the "Off' mode. <br />