My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11662
>
4200 – Liquid Waste Program
>
PR0420091
>
_O & M MANUAL - WEST LANE MOBILE HOME PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 4:52:30 PM
Creation date
10/5/2022 4:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
O & M MANUAL - WEST LANE MOBILE HOME PARK
RECORD_ID
PR0420091
PE
4242
FACILITY_ID
FA0000277
FACILITY_NAME
IL VINETO
STREET_NUMBER
11662
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05925003
CURRENT_STATUS
02
SITE_LOCATION
11662 N HAM LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For easy adjustment of the V -belt drive connection between the blower and motor, the <br />motor will be mounted on an adjustable motor mounting base. The blower will be fitted <br />with a dry type filter/silencer at the air intake. Each blower discharge will be fitted with a <br />check valve, and a flexible rubber discharge coupling. <br />For purposes of determining the blower performance and/or diffuser condition, a pressure <br />relief valve and pressure gauge will be mounted in the air manifold. <br />N. Central Control Panel <br />A central control system installed within a weatherproof enclosure will be provided. The <br />enclosure will be rated NEMA 4X -F Fiberglass. The electrical controls will consist of <br />magnetic starters, program timers and switches necessary to automatically control all <br />electrical devices and/or motors on the sewage treatment system. <br />M -O -A selector switches and magnetic starters in conjunction with the program timer will <br />control the blower/motor. The program timers will have the capability to operate the <br />treatment system when required as determined by the variation in the daily flow rate. <br />Properly sized circuit breakers and fuses will protect all electrical equipment and circuitry. <br />The control system will be designed to operate all duplex or standby equipment. The <br />enclosure will be wired for 230 volt, 1 phase incoming power. The control panel will be <br />mounted at a remote location. <br />O. Access Ladder, Service Walkways, and Service Handrails <br />A service walkway will be provided over the flow equalization tank and sludge holding <br />tank to service the plant equipment. Grating panels will each consist of one-piece skid <br />resistant steel plank. All grating panels will be constructed of 18 gauge, galvanized steel <br />sheet. Each grating panel has a standard 6" or 9" surface width and a 2 1/2 " rib depth. <br />Each panel will be supported to insure a safe uniform load carrying capacity" of 80 pounds <br />per square foot. <br />A two handrail system be provided around the service grating areas described above. <br />Service Handrails are supplied with mounting flanges for bolting into place. The rails and <br />posts are fabricated from 1-1/4" diameter schedule 40 carbon steel pipe, painted black. <br />P. Cathodic Protection <br />For cathodic protection for tanks partially or fully buried, six (6), 17 -pound magnesium <br />anode packages will be supplied. Anodes should be buried by the field contractor, <br />adjacent to the sides of the vessel and securely connected thereto by heavy copper wire <br />in good electrical contact with the connector lugs on the steel vessel. <br />P6018 West Lane MHP 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.