Laserfiche WebLink
JACOBSWell Decommissioning Work Plan <br /> 6. Works Cited <br /> California Department of Toxic Substances Control (DTSC). 2021. E-mail Correspondence Regarding <br /> Review of 2020 Groundwater Monitoring Report, Former Stockton Manufacturing Gas Plant, Pacific <br /> Gas and Electric Company (PG&E), 535 Center Street, Stockton, San Joaquin County. From Ms. <br /> Mere Golo (DTSC)to Ms. Anne Conner(PG&E), Ms. Aimee Phiri (CV-RWQCB), Mr. Fernando <br /> Amador(DTSC), and Ms. Rachel Sultan (ETIC). January 22. <br /> ETIC Engineering (ETIC). 2018. Monitoring Well Destruction Report(MW-5, MW-7, MW-8, MW-9R, MW- <br /> 18, and MW-19R), Stockton Manufactured Gas Plant, 535 Center Street, Stockton, California. <br /> October 29. <br /> ETIC. 2020. 2020 Groundwater Monitoring Report, Former Stockton Manufactured Gas Plant, Pacific Gas <br /> and Electric Company, 535 Center Street, Stockton, California. December 17. <br /> San Joaquin County Environmental Health Department(SJCEHD). 2005. Well Standards. <br /> https://www.sjgov.org/uploadedfiles/sjc/departments/ehd/forms/well%20standards.pdf. Accessed: <br /> August 13, 2021. <br /> 6 FES0817211625BAO <br />