FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable: <br /> Hazards: • Qualified operator,per established forklift training(certificate is required);Geosyntec operator must be <br /> Struck-by approved by Director of Health and Safety. <br /> Run over/roll over/tip over Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist. <br /> Overhead utilities/obstructions • Do not exceed lifting load limits. <br /> Caught between(pinch points) Forklift shall not be moved/driven with empty forks in raised position. <br /> Unstable/falling loads € • When not in use,forks lowered,brake set,controls in neutral,key removed. <br /> Elevated forks <br /> -Fluid leaks <br /> Geosyntec Procedure(s):HS-505-Safe Operation of Forklifts,HS-132-Competent Persons <br /> ; AERIAL BOOM/SCISSOR LIFT ❑Follow safe work practices: <br /> Hazards: ' • Operators to be appropriately trained and certified. <br /> Falls from basket Equipment is inspected after mobilization and is in good condition. <br /> Overhead utilities/obstructions • Harness&lanyard worn whenever operating the lift. <br /> Struck-by,run over,tip over . Overhead hazards and surface obstructions to be reviewed with operators/riders prior to use. <br /> Caught between(pinch points) <br /> Tip over <br /> Fluid leaks. <br /> Geosyntec Procedure(s):HS-509-Aerial Lifts <br /> CRANES ❑In addition to general safety practices for Operation of Heavy Equipment(above),as applicable: <br /> Hazards: _ • Only qualified persons operate cranes(certificate required). <br /> — electrocution by overhead utility • Critical Lift Plan&Checklist prepared/executed(See HS 506-Cranes)prior to mobilization. <br /> — injury in swing radius . Equipment to be inspected prior to mobilization and daily by crane operator. <br /> — injury from falling load Crane operator will remain at the controls at all times during operation. <br /> — crane tipping over due to <br /> overbalancing,high winds, • Crane operation must be performed under the direction of an appointed signal person at all times using hand <br /> unstable ground,unsafe slope, signals and/or voice/radio communication. <br /> bad placement of outriggers Crane to be level and stable(solid ground or crane mats/timbers,outriggers if present,cribbing);over- <br /> injury from mechanical hazards reaching or exceeding load limits is prohibited. <br /> • Keep area beneath suspended loads clear of personnel;tag lines used to maneuver load. <br /> • Rigging procedures—see Mechanical Lifts with Rigging,below. <br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons <br /> ❑ MECHANICAL LIFTS WITH RIGGING ❑In addition to general safety practices for Operation of Heavy Equipment and Cranes(above),as applicable: <br /> Applies to lifting by rigging attached • Slings,chains,rope,wire rope,as well as sheaves,boom and attachments used for lifting/hoisting shall be <br /> to crane,truck-mounted boom rig maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage. <br /> (e.g.drill rig),heavy equipment, . Coordinate lifting operations with competent person. <br /> mechanical/electrical hoist,similar • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart. <br /> equipment. Hooks will be equipped with safety latches. <br /> Hazards: Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use. <br /> —Mechanical hazards, • Ensure personnel are not positioned beneath elevated loads and that tag lines are used where appropriate. <br /> —Elevated loads <br /> Geosyntec Procedure(s):HS-506-Cranes <br /> WARNING! Confirmed or possible ❑Follow safe work practices per D.10."Utility-Related Hazards" <br /> close proximity to OVERHEAD or <br /> UNDERGROUND UTILITIES. Geosyntec Procedure(s):HS-304-Overhead/Underground Utility Hazards <br /> ` DEMOLITION ❑Develop/implement a demolition safety plan. <br /> Geosyntec Procedure(s): HS-132-Competent Persons <br /> BLASTING,UNEXPLODED € ❑Develop/implement safety plan for blasting,unexploded ordnance,as applicable. <br /> ORDNANCEGeosyntec Procedure(s):HS-307-Blasting and Use of Explosives,HS-132-Competent Persons <br /> PUBLIC AT RISK,SITE SECURITY ❑During site operations protect public(overhead protection,fencing,barriers,warning signs). <br /> ❑During off hours,protect public with fencing,barriers,warning signs/lights,other measures as appropriate. <br /> ❑Lock/secure hazardous materials and/or equipment. <br /> D.9. STORAGEMANDLING OF BULK MATERIALS(for chemical Storage,see D.ta&15) ❑ Applicable ® Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: <br /> BULK STORAGE HAZARDS: ❑Store materials in stable manner(stacked,racked,blocked,interlocked,tied,wrapped,or otherwise <br /> Collapse/movement of stacked/stored secured)to prevent tipping,sliding,rolling,falling or collapse. <br /> bags,blocks,containers,pipe,boxes, ❑Do not exceed load limits and ensure storage structure is stable,robust,secure for intended load. <br /> equipment,and similar. ❑Ensure stored materials do not block aisles,passageways,electrical panels,emergency equipment, <br /> ❑Stack/pallet/rack/shelf emergency access/egress routes,vehicle routes. <br /> ❑CONEX-box storage,or similar <br /> ; LIFTING/MANUAL MATERIAL ❑During manual handling of materials and equipment,use safe lifting practices and/or lift aids;do stretches <br /> HANDLING HAZARDS and use safe postures to protect from acute strains/sprains,overexertion,and cumulative trauma injuries. <br /> D.10. ELECTRICAL WORK TASKS ® Applicable Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications: Powered tools include electric coring machine and battery-operated hand drill. <br /> Geosyntec° Project/Task Name:TR0712/GSH OxyChem-Stockton SVP Installation <br /> THA Date:06/25/2022 Page 9 <br /> consultants <br />