FORKLIFT ❑In addition to general safety practices for heavy equipment(above),as applicable:
<br /> Hazards: • Qualified operator,per established forklift training(certificate is required);Geosyntec operator must be
<br /> Struck-by approved by Director of Health and Safety.
<br /> Run over/roll over/tip over Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist.
<br /> Overhead utilities/obstructions • Do not exceed lifting load limits.
<br /> Caught between(pinch points) Forklift shall not be moved/driven with empty forks in raised position.
<br /> Unstable/falling loads € • When not in use,forks lowered,brake set,controls in neutral,key removed.
<br /> Elevated forks
<br /> -Fluid leaks
<br /> Geosyntec Procedure(s):HS-505-Safe Operation of Forklifts,HS-132-Competent Persons
<br /> ; AERIAL BOOM/SCISSOR LIFT ❑Follow safe work practices:
<br /> Hazards: ' • Operators to be appropriately trained and certified.
<br /> Falls from basket Equipment is inspected after mobilization and is in good condition.
<br /> Overhead utilities/obstructions • Harness&lanyard worn whenever operating the lift.
<br /> Struck-by,run over,tip over . Overhead hazards and surface obstructions to be reviewed with operators/riders prior to use.
<br /> Caught between(pinch points)
<br /> Tip over
<br /> Fluid leaks.
<br /> Geosyntec Procedure(s):HS-509-Aerial Lifts
<br /> CRANES ❑In addition to general safety practices for Operation of Heavy Equipment(above),as applicable:
<br /> Hazards: _ • Only qualified persons operate cranes(certificate required).
<br /> — electrocution by overhead utility • Critical Lift Plan&Checklist prepared/executed(See HS 506-Cranes)prior to mobilization.
<br /> — injury in swing radius . Equipment to be inspected prior to mobilization and daily by crane operator.
<br /> — injury from falling load Crane operator will remain at the controls at all times during operation.
<br /> — crane tipping over due to
<br /> overbalancing,high winds, • Crane operation must be performed under the direction of an appointed signal person at all times using hand
<br /> unstable ground,unsafe slope, signals and/or voice/radio communication.
<br /> bad placement of outriggers Crane to be level and stable(solid ground or crane mats/timbers,outriggers if present,cribbing);over-
<br /> injury from mechanical hazards reaching or exceeding load limits is prohibited.
<br /> • Keep area beneath suspended loads clear of personnel;tag lines used to maneuver load.
<br /> • Rigging procedures—see Mechanical Lifts with Rigging,below.
<br /> Geosyntec Procedure(s):HS-506-Cranes,HS-132-Competent Persons
<br /> ❑ MECHANICAL LIFTS WITH RIGGING ❑In addition to general safety practices for Operation of Heavy Equipment and Cranes(above),as applicable:
<br /> Applies to lifting by rigging attached • Slings,chains,rope,wire rope,as well as sheaves,boom and attachments used for lifting/hoisting shall be
<br /> to crane,truck-mounted boom rig maintained in good condition,inspected daily,and used/stored in a manner as to protect from damage.
<br /> (e.g.drill rig),heavy equipment, . Coordinate lifting operations with competent person.
<br /> mechanical/electrical hoist,similar • Do not exceed loading limits of lifting equipment;perform work in accordance with equipment load chart.
<br /> equipment. Hooks will be equipped with safety latches.
<br /> Hazards: Ensure anchor points for winch or other lift device(such as davit arm)are engineered for intended use.
<br /> —Mechanical hazards, • Ensure personnel are not positioned beneath elevated loads and that tag lines are used where appropriate.
<br /> —Elevated loads
<br /> Geosyntec Procedure(s):HS-506-Cranes
<br /> WARNING! Confirmed or possible ❑Follow safe work practices per D.10."Utility-Related Hazards"
<br /> close proximity to OVERHEAD or
<br /> UNDERGROUND UTILITIES. Geosyntec Procedure(s):HS-304-Overhead/Underground Utility Hazards
<br /> ` DEMOLITION ❑Develop/implement a demolition safety plan.
<br /> Geosyntec Procedure(s): HS-132-Competent Persons
<br /> BLASTING,UNEXPLODED € ❑Develop/implement safety plan for blasting,unexploded ordnance,as applicable.
<br /> ORDNANCEGeosyntec Procedure(s):HS-307-Blasting and Use of Explosives,HS-132-Competent Persons
<br /> PUBLIC AT RISK,SITE SECURITY ❑During site operations protect public(overhead protection,fencing,barriers,warning signs).
<br /> ❑During off hours,protect public with fencing,barriers,warning signs/lights,other measures as appropriate.
<br /> ❑Lock/secure hazardous materials and/or equipment.
<br /> D.9. STORAGEMANDLING OF BULK MATERIALS(for chemical Storage,see D.ta&15) ❑ Applicable ® Not Applicable, Not Anticipated
<br /> Site-Specific Notes&Clarifications:
<br /> BULK STORAGE HAZARDS: ❑Store materials in stable manner(stacked,racked,blocked,interlocked,tied,wrapped,or otherwise
<br /> Collapse/movement of stacked/stored secured)to prevent tipping,sliding,rolling,falling or collapse.
<br /> bags,blocks,containers,pipe,boxes, ❑Do not exceed load limits and ensure storage structure is stable,robust,secure for intended load.
<br /> equipment,and similar. ❑Ensure stored materials do not block aisles,passageways,electrical panels,emergency equipment,
<br /> ❑Stack/pallet/rack/shelf emergency access/egress routes,vehicle routes.
<br /> ❑CONEX-box storage,or similar
<br /> ; LIFTING/MANUAL MATERIAL ❑During manual handling of materials and equipment,use safe lifting practices and/or lift aids;do stretches
<br /> HANDLING HAZARDS and use safe postures to protect from acute strains/sprains,overexertion,and cumulative trauma injuries.
<br /> D.10. ELECTRICAL WORK TASKS ® Applicable Not Applicable, Not Anticipated
<br /> Site-Specific Notes&Clarifications: Powered tools include electric coring machine and battery-operated hand drill.
<br /> Geosyntec° Project/Task Name:TR0712/GSH OxyChem-Stockton SVP Installation
<br /> THA Date:06/25/2022 Page 9