Laserfiche WebLink
9.0 ASBESTOS ASSESSMENT <br />CAC did not access the structures at the Site to conduct an asbestos assessment of the building <br />materials. The structures were constructed during the period when asbestos -containing materials <br />may have been used. Prior to demolition activities, an asbestos assessment should be <br />conducted. <br />an <br />