Laserfiche WebLink
• <br />South Little john Creek Area <br />E <br />A ditch was graded along the toe of the landfill,. slope that <br />drains any surface runoff -to the west, and into the main runoff <br />collection area. <br />ACCESS ROAD CONSTRUCTION <br />The main access road is constructed using six inches of base <br />rock. The road that leads from the main access road to the <br />current waste disposal area was constructed using six inches of <br />base rock on top of a, woven geotexthe . All roads drain at a <br />slope of at, least 2% to prevent ponding. <br />