My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1990-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:13:34 PM
Creation date
10/17/2022 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1993
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
788
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k"KLE1 N FELDER <br />April 9, 1992 <br />File: 24-220025-000 <br />Mr. Greg Olivera <br />San Joaquin County Public Health Services <br />Environmental Health Division <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />SUBJECT: Ground Water Monitoring Well Installation <br />Forward Landfill <br />Stockton, California <br />Dear Mr. Olivera: <br />RECEIVED <br />APR 10 1992 <br />ENVIRONMENTAL <br />CESLTH <br />PERM <br />Please find enclosed a brief work plan to install five ground water monitoring wells at <br />Forward Landfill, San Joaquin County. The wells will be installed in the same manner as <br />the existing wells at the site. The wells will be installed in a phased approach as deemed <br />necessary. Also enclosed is a well permit application form and the appropriate fees. We <br />are tentatively scheduled to start drilling on April 14 with the first phase of work (MW -17 <br />through 19). I will give you a minimum of 48 hours notice before we start work so we can <br />schedule grout inspections. <br />If you have any questions regarding the attached information, please do not hesitate to call. <br />Sincerely, <br />KLEINFELDER, INC. <br />istina J. <br />Proje Ge( <br />Eric S. Findlay, R.G. <br />Senior Geologist <br />CJK:ESF:mb <br />Attachments <br />cc Ms. Carrie Cummings, Forward, Inc. <br />FWP-92-04 <br />Copyright 1992 Kleinfelder, Inc. <br />KLEINFELDER 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.