Laserfiche WebLink
KLEINFEL E <br />WHMS-IM14100111 <br />Forward Inc. is completing a new waste treatment unit within WMU-G on the north side of <br />the landfill. As a result, the line of wells which monitor the point of compliance along the <br />north property boundary must be extended to monitor the new unit. <br />Ground water elevation measurements over the last few years indicate that the ground <br />water gradients frequently swing to the east and southeast in the southern part of the <br />landfill. As a result, the present background well (MW -12/12B) is occasionally <br />downgradient of the Eastern Ash Pit and WMU-F, and the eastern property boundary <br />along Austin Road may not be monitored fully to the south of MW -13/13B. <br />Kleinfelder proposes to install three new wells (MW -17 through MW -19) along the <br />northern boundary downgradient of WMU-G, one new background well at the western <br />edge of the property (MW -20), and one new monitoring well (MW -16) on the eastern <br />property boundary south of MW -13/13B. Proposed monitoring well locations are shown <br />on Plate 1. Details of the proposed construction of the wells are presented in the following <br />scope of services. <br />The installation will be in a phased approach. Phase 1 (MW -17, 18, 19) will be installed <br />starting April 14 or 15. Phase 2 (MW -16 and 20) wells will be installed at a yet to be <br />determined date. <br />SCOPE OF SERVICES <br />Drilling, Installing, and Developing Five Monitoring Wells <br />Five borings will be drilled at locations shown on Plate 1. The borings will be drilled to <br />approximate depths of 100 feet following the protocol described in Appendix A, Section <br />A-2. A 4 -inch well will be installed in each boring, following the protocol described in <br />Appendix A, Section A-3.1. <br />Following installation, the wells will be developed to remove sediment and set the filter <br />pack. The wells will be developed as described in Appendix A, Section A-3.2. <br />The tops of the well casing will be surveyed as described in Appendix A, Section A-3.3. It <br />is assumed that Forward Inc. will arrange for the wells to be surveyed. <br />Following well installation, the new wells will be incorporated into the Post -Closure and <br />Chapter 15 Monitoring Programs for Forward Landfill. <br />Report of Findings <br />Upon completion of the field activities described above, a report of monitoring well <br />construction activities and observations will be prepared. <br />FW -92-04 <br />Copyright 1992 Meinfelder, Inc. <br />