My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015174
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4206
>
2600 - Land Use Program
>
PA-2200207
>
SU0015174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:10 PM
Creation date
10/18/2022 8:40:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015174
PE
2632
FACILITY_NAME
PA-2200207
STREET_NUMBER
4206
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917254, -55
ENTERED_DATE
9/20/2022 12:00:00 AM
SITE_LOCATION
4206 S HWY 99
RECEIVED_DATE
3/20/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> PA-2200207 (A) <br /> 9) Prior to release of the grading permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and ba available for review upon request. <br /> 10) Applicant shall file a Notice of Intent(NOI) with the States Westar Resources Control Board <br /> (SWRCB) and comply with the State"General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Oischarga Identification Number <br /> (WPI O), issued by SWRCB, shall ba submitted to Public Works prior to release of the <br /> grading permit. Contact the SWRCB at(9'16) 341-5537 for further information. <br /> Informational Notes: <br /> (i.) Wastewater shall not ba allowed into the storm drainage system. <br /> (ii.) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite. <br /> CH:GM <br />
The URL can be used to link to this page
Your browser does not support the video tag.