Laserfiche WebLink
s 7 c o c, Inc. <br /> ® sss ease waver w..enne . sto�l:..,n,cn aszoz . (zpa)zas-osyn.emaa: gra®..i«x.o.g <br /> San/oaquin County Muth-Species Habitat Conseruarion Er Open Spwce Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICH TO SJCOG,Inc. <br /> To: Nancy Artoyo,San Joaquin County.Community DevabpmeM Department <br /> From: Laurel Boyd, SJCOG,Ina. Phone: (209)235-0574 Email: boydQsjcog.org <br /> Data: March 21,2024 <br /> Local Jurisdiction ProjeM Tltla: PA-2200207(A) <br /> Assessor Parcel NumbeKs): '179-'1'12-54,-55 <br /> Local Juristllegon Project Number: PA-2200207(A) <br /> Total Aores to ba converted from Opan Spaces Usa: Unknown <br /> Habitat Typos to ba Olaturbed: Urban Habitat Land <br /> Speelas Impact Findings: Findings to ba determined by SJMSCP biologist. <br /> Daar Ms. Arroyo: <br /> SJCOG, Inc. has reviewed the project referral for PA-2200207 (A). This projeM consists of an AdminisireYlya Vsa Panni[ <br /> application for a truck parking facility to ba constructed in 2 phases over 5 years. Phase t, wish building permits issued <br /> within 3 years, includes iha development of a truck parking facility with a maximum of 61 truck parking spaces, 66 trailer <br /> parking spaces, and the parking for 13 passenger cars. Phase 1 is unmanned. Phase 2, with building permits issued <br /> within 5 years, Includes the construction of an '1'1,500 square foot office building. Phase 2 is manned, and Inciudas the <br /> development of the on-site well, on-site storm dreina9e, and on-sits static water suppression tank. The project site is on <br /> the east side of S. State Routes 99 E. Fron[aga Road, 4,650 feat north of E.Arch Road, Stockton(APN/Address: '179-'172- <br /> 54, -55/4206 S. State Routs 99 E. Frontage Road, Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Opan Space Pian <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal andan9erad species acts, <br /> and ansuras that the Impacts ora mitigated below a lavas of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Maasura ora properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in iha SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> Th)s ProJact is subject to iha SJMSCP. This can ba up [o a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> Information package. hrco�riwwew sycm otn <br /> Please contact SJMSCP staff regarding completing iha following steps to satisfy SJMSCP requirements: <br /> Schedule a SJMSCP Biologist to perform apre-construction survey prior to any ground dlsturbanca <br /> - SJMSCP Incidental take Minimization Measures and mitigation raquiremant: <br /> 1. lneidemal Take Minimivatian Maaaurea pTMMa)will be issued to thv pr ject and moat be signed by the project applicant prior to any <br /> ground diatmbence but no later than siu(6)montba Gom mceipt oFtha ITMMs. IP ITMMs arc not signetl within six mnnthA[he applicant <br /> reapply for SJMSCP Coverage. Upon receipt of aign¢d ITMMa from pr jest applicenq SJCOC,Inc.stafFwill sign the ITMMa_ This <br /> a the eRectiva date nEthe ITMMa. <br /> 2. Untler no circumstance shall grouts disturbance occur wiNout compliance and satisfaction ofthe ITMMs. <br /> 3. Upon iasuanca of Polly executed 1TMMs and prior to any grountl disturba,cq the project applicant moat <br /> a. Post a band for payment oftha applicable SJMSCP Re covering Ne enfirety of Na project acreage being covered(the bond <br /> shoWa be valid for nes longer than a 6 month period):or <br /> b. Pry the eypropriate SIMSCP kde Por Ne entireH ofthe ptajed acreega being covered:or <br /> nedicat¢land in-lieu of fees.either as consvrva<ion easements or fee title:or <br /> tl. Purchase approved mitigation bank credits. <br />