Laserfiche WebLink
.Pacific Gas and Plan Review Team PGEP�aoRa=�awcaa9a.==m <br /> E/ectric Company La=a Ma=aseTe=� <br /> February 22, 2024 <br /> Nancy Arroyo <br /> County of San Joaquin <br /> 181 O E Hazelton Ava <br /> Stockton, CA 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Nancy Arroyo, <br /> Thank you for submitting the PA-2200277, PA-2200278 and PA-2200277 plans for our review. <br /> PGBE will review the submitted plans in relationship to any existing Gas and Electric facilities <br /> within the project area. If the proposed project is adjacent/or within PGBE owned property <br /> and/or easements, we will ba working with you to ensure compatible uses and activities near <br /> our facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) <br /> and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br /> your safety and to protect PGBE's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 7. This plan review process does not replace the application process for PGBE gas or <br /> electric service your project may require. For these requests, please Continue to work <br /> with PGBE Service Planning: htt -//www og / VS/b / �ce /b ilding- <br /> and-renovation/overview/overview.Daae. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PGBE's facilities are to be incorporated within <br /> any CEQA document. PGBE needs to verify that the CEQA document will identify any <br /> required future PGBE services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or new <br /> installation of PGBE facilities. <br /> Any proposed uses within the PGBE fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PGBE's fee strip or easement. PGBE will advise if the <br /> necessity to incorporate a CPUC Section 851filing is required. <br /> This letter does not constitute PGBE's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PGBE will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGSaE Gas and Electric Facilities Page 1 <br /> Public <br />