My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015174
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4206
>
2600 - Land Use Program
>
PA-2200207
>
SU0015174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:10 PM
Creation date
10/18/2022 8:40:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015174
PE
2632
FACILITY_NAME
PA-2200207
STREET_NUMBER
4206
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917254, -55
ENTERED_DATE
9/20/2022 12:00:00 AM
SITE_LOCATION
4206 S HWY 99
RECEIVED_DATE
3/20/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> S E/ect�ic Company <br /> 1 t. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathotlic protection <br /> system must be reviewed and approved by PGS.E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PGS,E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommotlate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provitler of tlistribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PG8,E's facilities must be reviewetl and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PGSzE Gas and Electric Facilities Page 4 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.