Laserfiche WebLink
SHALLOW INJECTION WELL INSTALLATION WORK PLAN <br />arcadis.com <br />2022.02.15 OCC Lathrop_Shallow Injection Well Installation Work Plan_final ii <br />TABLES <br />Table 1 Proposed Well Construction Details <br /> <br />APPENDIX <br />Appendix A SJCEHD Well Standards <br /> <br />ACRONYMS AND ABBREVIATIONS <br />Arcadis Arcadis U.S., Inc. <br />GAC granular activated carbon <br />GETS groundwater extraction and treatment system <br />HASP Site-Specific Health and Safety Plan <br />RWQCB California Regional Water Quality Control Board <br />site former Occidental Chemical Corporation manufacturing facility, located at 16777 <br />Howland Road near the southwest corner of Louise Avenue and Howland Road in <br />Lathrop, San Joaquin County, California <br />SJCEHD San Joaquin County Environmental Health Department <br />USA Underground Service Alert <br />Work Plan Injection Well Installation Work Plan