My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085286 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
SR0085286 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 1:32:37 PM
Creation date
10/18/2022 1:17:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085286
PE
2903
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
City
STOCKTON
Zip
95202
APN
13905409
ENTERED_DATE
5/17/2022 12:00:00 AM
SITE_LOCATION
715 N HUNTER
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04 May 2022 AdvancedGeo <br /> Project No. 02-0926 An Employee-Owned Compony <br /> Page 2 of 2 <br /> Prior to well destruction activities, all wells will be checked for total depth and well integrity <br /> using a Solinst water level meter. Any obstructions found in the wells will be removed. <br /> AGI proposes to destroy wells MW-4 and MW-9 by over drilling. The wells will be <br /> drilled-out to total depths of 40 feet bsg utilizing a hollow-stem auger drill rig equipped <br /> with 8-inch diameter augers. All original well construction materials will be removed <br /> (including well casing, screen, filter pack, and annular seal) by the drill rig to ensure that <br /> no residual contamination is sealed within the abandoned borehole and a vertical conduit <br /> does not remain. The boring will be completely backfilled to surface grade with a cement <br /> grout mixture (Portland type II) and finished at the surface with native soil or concrete to <br /> match the existing surface. The grout mixture will consist of a ratio of not more than six <br /> gallons of water for every 94-pound sack of Portland type II cement. The drill rig hollow <br /> stem augers will be utilized as a tremie pipe during deployment of the grout mixture. Any <br /> groundwater displaced by the grout mixture will be routed into properly labeled <br /> Department of Transportation (DOT)-approved 55-gallon drums. All investigation derived <br /> waste will be containerized in properly labeled DOT-approved 55-gallon drums and <br /> disposed as a non-hazardous waste. <br /> 3.0. REPORTING <br /> Upon completion of field work and disposal of waste, a soil sampling and well destruction <br /> report describing the activities and procedures, including documentation of waste <br /> disposal, will be prepared, and submitted to the SJCEHD. The report will be in a format <br /> acceptable to the SJEHD and will be reviewed and signed by a California Professional <br /> Geologist. <br /> Sincerely, <br /> AdvancedGeo, Inc. <br /> Evan J. Schmidt Daniel J. Villanueva <br /> Staff Geologist Senior Geologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.