My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0055313
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
11366
>
2200 - Hazardous Waste Program
>
CO0055313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 3:03:11 PM
Creation date
10/20/2022 9:49:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
RECORD_ID
CO0055313
PE
2200
STREET_NUMBER
11366
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
10/19/2022 12:00:00 AM
SITE_LOCATION
11366 W LINNE RD
RECEIVED_DATE
4/29/1986 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 1986 <br /> Bill Greenspan <br /> Page 3 <br /> This phase will require government approval of the plan of <br /> correction to be developed as part of that contract. At <br /> this stage, the walls of the burned area must be <br /> demolished, and the government may require (and we re- <br /> commend) fencing. We suggest renting temporary fencing. <br /> 5) CLOSURE <br /> Backfill of cleaned area after government approval of the <br /> cleanup is usually required. <br /> 6) COSTS <br /> Phase I can be firmly costed as a result of our <br /> investigations so far. <br /> Our firm bid is $18,965.00 which will be reduced by $600.00 if <br /> Mr. Saranevesht can inform us of a place in the Bay Area <br /> which will accept the 3 drums of recyclable waste etchant <br /> and can provide acceptable paperwork so that the <br /> manufacturer will accept it for credit. <br /> Phase II can be costed as our site assessment proceeds. <br /> It should be less than Phase I since solids are much <br /> cheaper to dispose. Time to completion 5 - 10 days from <br /> commencement. <br /> Phase III can only be costed after analytical results are <br /> obtained, at the earliest 3 weeks from today (if the labs <br /> are not overloaded) . Time to completion cannot yet be <br /> determined, and may be subject to regulatory agency <br /> delays. <br /> We can begin work as early as we receive permission and payment <br /> of half the bid in advance, the rest to follow on completion of <br /> waste removal. Please feel free to call on me to clarify any of <br /> these points. Phase I should be completed within one week of <br /> commencement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.