Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> °o SAN JOAQUIN COUNTY <br /> z G Unit Supervisors <br /> y{ f2< Donna K.Heran,R.E.H.S. Carl Bor an <br /> Director 304 East Weber Avenue,Third Floor gm ,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> ` Douglas W.Wilson,R.E.H.S. <br /> cq ,P Program Manager 209hone: <br /> ��Foar' Laurie A.Cotulla,R.E.H.S. Telephone: ( )468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> July 3,2002 <br /> Kevin Basso,General Manager <br /> P.O.Box 6336 <br /> 1145 W.Charter Way <br /> Stockton,CA 95206 <br /> RE: FORWARD LANDFILL—SOLID WASTE FACILITIES PERMIT APPLICATION PACKAGE <br /> Dear Mr.Basso: <br /> This letter supersedes the letter dated on June 25,2002 on the above referenced package. <br /> San Joaquin County Environmental Health Department(SJC-EHD)has received the above referenced package on <br /> May 28,2002. The application has been reviewed for completeness in accordance with Title 27 section 21570, <br /> California Code of Regulations(CCR). <br /> SJC-EHD has determined that the application package requires the followings items to be addressed: <br /> 1. JTD,Appendices L, Table 8 Forward Landfill Closure Cost Estimate Summary,Item#6. <br /> The Joint Technical Document does not provide any closure cost estimate for landfill gas monitoring <br /> system. Provide cost estimate for landfill gas monitoring system. <br /> 2. JTD,page 2-6,Austin Road Interim Closure. <br /> The disposal of solid waste at existing Austin Landfill shall cease on or before December 31,2002 as <br /> current SWFP permitted. If the extension of deadline is proposed,in addition to approval from CRWQCB, <br /> approval from SJC-EHD and CIWMB are required. <br /> 3. JTD,Section 6.0 Disposal Site Operations. <br /> The JTD does not provide plan and method that only class III waste is disposed into the space between <br /> Interim final cover and intermediate liner of existing Austin Landfill. Provide the plan indicates how this <br /> activity will be conducted. <br /> 4. JTD,page 7-5, Construction/Destruction of monitoring well. <br /> Construction or destruction of monitoring well shall be inspected by SJC-EHD under permit. <br /> If you have any questions,please contact Steven C.Shih,R.E.H.S.of my staff at(209)468-9850. <br /> Donna Heran,Director <br /> Environmental Health Department <br /> Robert McClellon,Supervising R.E.H.S. <br /> Environmental Health Department <br /> cc: Keith Kennedy,California Integrated Waste Management Board <br /> Ross D.Atkinson,California Regional Water Quality Control Board <br /> RM:scs Page I of 1 <br />