My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:14:05 PM
Creation date
10/21/2022 10:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2002
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4 BACKFILL AND RESTORATION OF SURFACE <br /> Under this task, backfilling of the LFG monitoring probe borings, construct the LFG <br /> monitoring probe heads, concrete vault with steel access lid and bollards associated <br /> with constructing the new LFG monitoring probes will be performed. <br /> • Once backfilling is complete, the probe heads will be fabricated as shown on the <br /> construction drawings (Figure 5) except when directed otherwise by the Field <br /> Engineer. <br /> • Concrete vault with steel access lid will be installed for each monitoring probe. <br /> • Two (2) bollards will be installed around each monument as shown on the <br /> construction drawings (Figure 5). <br /> 4.5 SURVEY NEW LANDFILL GAS MONITORING PROBES AND PREPARE AS-BUILT <br /> PROBE LOCATION MAP <br /> Once installation of the monitoring probes are completed, the probes will be <br /> surveyed by a licensed surveyor for location and elevation relative to mean sea <br /> level. An as-built probe location map will be prepared utilizing AutoCAD 2002. The <br /> map will indicate the installed probes in relation to the existing site. <br /> 4.6 SCHEDULE <br /> It is estimated construction of the probes could be completed within three (3) weeks <br /> after receiving approved permits. <br /> 4-2 <br /> Multilevel LFG Monitoring Probe Installation Work Plan <br /> L:\Allied\Forward Landfill\2001.132\Reports\Workplan\Sect4rev2.doc:7/2/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.