My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:14:05 PM
Creation date
10/21/2022 10:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2002
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. -33- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS 11 LANDFILL <br /> SAN JOAQUIN COUNTY <br /> Task Compliance Date <br /> A. Construction Plans <br /> Submit construction and design plans, One Month Prior to start of <br /> specifications, construction schedule and construction of any landfill <br /> construction quality assurance plan. expansion. <br /> for Executive Officer review and approval. <br /> (see Construction Specification D.1) <br /> B. Construction Report <br /> Submit as-built plans, construction quality Prior to discharge of waste to a <br /> assurance, and certification report for Executive new unit. <br /> Officer review and approval. <br /> (see Construction Specification D.6) <br /> C. Financial Assurance Review <br /> 1. Annual Review of Financial Assurance for 30 April each year <br /> (see Provision G.10.) <br /> 2. Annual Review of Financial Assurance for 30 April each year <br /> (see Provision G.11.) <br /> D. Corrective Actions <br /> 1. Install improvements to the landfill gas 31 October 2002 <br /> collection system that will prevent future <br /> release of VOCs from the facility. <br /> 2. Complete construction of enhanced 15 October 2002 <br /> groundwater recharge facilities. <br /> 3. Install interim final cover over the entire 15 November 2002 <br /> unlined footprint of the landfill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.