My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:14:05 PM
Creation date
10/21/2022 10:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2002
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d t 8 <br /> SUIriIriarV Table <br /> Forward Landfill Permitted—SWFP Cover from ADC=23% 1) All of the requested tonnage records have not yet <br /> 39-AA-0015 allows tarps. RDSI if C&D ADC is included been received. <br /> dated 2000 allows or 21%if not. 2) RDSI may need to included C&D ADC as a <br /> green material,and listed ADC or tonnage specified as C&D ADC <br /> shredded tires. If soil accepted is on DRS may need to be recalculated as <br /> Actual—Green included then 61%of the beneficial use. <br /> material and maybe total cover needs were 3) Cover materials need to be applied daily. <br /> C&D obtained from off-site. 4) Working face may need to be reduced in size. <br /> 5) An RDSI amendment should be submitted with <br /> adequate supporting information on cover/ADC <br /> types and quantities. <br /> 6) LEA did visit the site with Board staff. <br /> *The calculations for ADC soil/cover accepted as a%of the annual cover needs is based on the working <br /> face size(either measured at the facility on the day of the survey or that which is described in the RDSI) <br /> and the volume of`soil' required to provide a six inch average thickness for this area for the number of <br /> days the facility would require cover during the year. ADC/soil accepted information either submitted by <br /> the LEA,operator,or obtained from the DRS was then compared to the calculated amounts to develop a <br /> percentage. ADC material was converted to a soil equivalent based upon the conversion table above <br /> titled,Cover Soil or Soil Equivalent to provide for the coverage differences because of the differences in <br /> weight and average depth allowed for the ADC materials. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.