My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 8:53:09 AM
Creation date
10/21/2022 10:11:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> U ST UDnito-ring Site Plan <br /> UST MONITORING SITE PLAN <br /> SAN JGACLUIN COUNTY JAIL <br /> 70M MICHAEL CAN LIS BLVD,FRENCH CAMP,CA 95231 <br /> N <br /> we <br /> ti <br /> ORTHD51L T_--'%{ <br /> BOILER ROOM <br /> INVENTORY <br /> PROBE ROBE <br /> � <br /> SLT v SENSOR op%r 31�-3 221-1 <br /> PIPING, <br /> �i ARNUL.ARSENSORDPW30-3223 <br /> PIPING <br /> GEAERA TOR AT <br /> ANtdLIL-AR SENSOR DPW 3-0-3223 <br /> A <br /> 3TMP SENSOR DPA-30-322I-1 <br /> P <br /> KEY <br /> A-ANNULAR <br /> FILL B- BRDIE.SENSOR <br /> C- FLOATS&CI-Lk S <br /> 50UM R3L TANK F- FILL <br /> L- PLLD <br /> X1-MANWAY <br /> P- PROBE <br /> 5- STP <br /> T- TURHLNE <br /> V-VAPOR <br /> X-SMV P SENSOR <br /> Date map was dravm:11-17-2017 <br /> Instructions <br /> 11 you already have a diagram that shows a9 required information.you rray include r1,rather than this page,with your Monitoring 5ystam Certiru,,st on. On yoursrte plan, <br /> shorn Me genera!Iaycutaf tanks and piping. Gleady identify locations of the Fallowing equipment,if installed:monitoring system cantrof panels;sensors monkoratg tank <br /> annular spaces,sumps.dispenser pans,spill Dmtainem.or other secandary cantas�mentarem:mechanical or efeetronic line leak detedlors;and in-tank liquid love <br /> prohes('rt used for Leak detectlon). In the space provided,nate the date this She Phn was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.