Laserfiche WebLink
�• N <br /> qo <br /> ° I IAS-08 <br /> I♦ <br /> W-235 <br /> ♦ lt� P-103 <br /> O <br /> SITE 37 <br /> B C <br /> -W 322— P-109 <br /> W-207 W.208 W-157 D <br /> P-175 IAS-11 <br /> IAS-12 <br /> E SITE 07 <br /> /"F) W-083 <br /> A _ <br /> W-329 <br /> I <br /> I <br /> W-196 W-187 <br /> W-188 <br /> W-199 W-193 <br /> SITE 38 <br /> P-176 <br /> P-181 <br /> IAS-01 <br /> W-200 <br /> I <br /> W-046 IAS-13 <br /> t-e , W-144 W-141 H <br /> W-031 <br /> O1 <br /> • \ W-208 <br /> 1 <br /> I <br /> � I <br /> 1 <br /> 1 <br /> • IAS-02 IAS-14 <br /> 1 <br /> 1 <br /> - <br /> = 1 W-029 <br /> � , � IAS-15 Channel <br /> / <br /> L <br /> 1 W-028 <br /> o � / <br /> Legend Notes 215 107.5 0 215 Feet <br /> W-029=Well ID <br /> Monitoring Well(will be gauged in Vinyl Chloride concentration greater VOCs=Volatile Organic Compound <br /> 3Q22) than 0.5µg/L-dashed where inferred Contours are based on 2020 data. <br /> Monitoring Well(will be sampled for cis-1,2-DCE concentration greater Northern Landfills Sampling Locations <br /> VOCs and Dioxins/Furans in 3Q22) than 6µg/L-dashed where inferred <br /> 3 Monitoring Well(will be sampled for Drainage Channel 2022 Groundwater Monitoring Work Plan <br /> VOCs and Radionuclides in 3Q22) Roads Rough and Ready Island,Port of Stockton <br /> Stockton,California <br /> Monitoring Well(will be sampled for t Rail Line Construction Area <br /> VOCs in 3Q22) p Geos teC Figure <br /> e <br /> 0 Landfill Cell Boundary(ERS,2009) /Y 11 <br /> Piezometer(will be sam led for y g <br /> VOCs in 3Q22) 0 Contamination Sites <br /> L■ ■. Rough and Ready Island Source.,Esn,Maxor,GeoEye,Earthstar consultants <br /> h 1�■■� boundary Geographics,CNES/Airbus DS,USDA,USGS, 27 <br /> c� AeroGRID,IGN,and the GIS User Community Project No.:WR2501 B June 2022 <br />