My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085888_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10088
>
2600 - Land Use Program
>
SR0085888_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:09 PM
Creation date
10/26/2022 4:44:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0085888
PE
2602
FACILITY_NAME
HARVEST BIBLE CHURCH
STREET_NUMBER
10088
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607047
ENTERED_DATE
10/10/2022 12:00:00 AM
SITE_LOCATION
10088 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> j E. SURFACE WATER INFORMATION AND CALCULATIONS <br /> NLS§3.2. The property is 7.76 acres and consists of impervious buildings, asphalt/concrete <br /> hardscape, and pervious landscaping consisting of effluent disposal and stormwater disposal areas. <br /> These areas are delineated and quantified as follows: <br /> TABLE 3 <br /> goo wm r o <br /> 1/015/1 / <br /> HARVEST CHURCH BUILDING AND ASSOCIATED BUILDINGS 16,940 SQ FT;0.389 AC <br /> ASPIRE VINCENT SHALVEY ACADEMY AND PLAY AREA 58,215 SQ FT; 1.34 AC <br /> ASPHALT PARKING AREAS 138,716 SQ FT;3.185 AC <br /> PERVIOUS LANDSCAPING 124,190 SQ FT;2.851 AC <br /> TOTALS 338,061 SQ FT;7.76 AC <br /> The rainfall recharge factor used in the Hantzsche-Finnemore equation below has been derived <br /> from a water balance document from Hantzsche (one of the authors of the nitrate loading equation) <br /> found in Appendix G, which illustrates his water balance analysis of Net Rainfall Recharge (NRR). <br /> The data presented in this document indicates an NRR of 8.82" for the Stockton area, and is <br /> therefore applicable for this project. <br /> The following is the Mass Balance Approach utilizing the referenced precipitation and Eto data: <br /> Net Rainfall Recharge= 8.82" (0.735 ft) <br /> Pervious areas=2.851ac <br /> Impervious areas=4.91 ac <br /> 0.735 ft x 325,851 gals/ac-ft=239,500 gals/ac x 4.909 ac= 1,175,708 gals runoff from impervious areas <br /> flowing into stormwater runoff areas. (R1) <br /> 0.735 ft x 325,851 gals/ac-ft=239,500 gals/ac x 2.851.6 ac=682,815 gals rainfall directly as recharge <br /> from pervious areas. (R2) <br /> R1 +R2 =R 1,175,708 gals+682,815 gals= 1,858,523 gals=5.88 ac-ft <br /> i <br /> l <br /> Page -5- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.