Laserfiche WebLink
10' SEPARATION DISTANCE <br />FROM BUILDING FOUNDATION <br />5' SEPARATION DISTANCE <br />FROM PROPERTY LINE \ <br />SEEPAGE PIT <br />N 4"DIA. X 25 <br />3"DIA PERFORATEDLEACHLINE <br />W/IN 4"DIA.PERFORATED TUBING <br />100' PRIMARY AND 100% SAWCUT TO INSTALL 100' PRIMARY AND 100% ""h <br />REPLACEMENT LEACHLINE g�, <br />3" TIGHTLINE REPLACEMENT LEACHLAMINE <br />EXISTING CONCRETE�N-z� <br />SLAB TO REMAIN <br />NORTH PROPERTY LINE P,a, <br />*'4 -1 <br />o 0 2000 GALLON <br />F f. '.1.• <br />SEPTIC TANK <br />INSTALL OBSERVATION "T" (2) =o <br />IN CHRISTY BOX PROPOSED NEW BUILDING <br />U � N <br />=am <br />U Q <br />0 O O <br />mm0m LL O <br />EXISTING CHURCH/SCHOOL BUILDING 0 m E <br />o <br />150' RADIUS FROM =o" <br />PUBLIC WELL <br />RESERVE/REPLACEMENT LEACHLINE <br />8"DIA. INFILTRATOR EZ -FLOW MODULES - 6 ROWS <br />1' DIRT SEPERATION DISTANCE <br />PRIMARY LEACHLINE <br />PIAN VIEW <br />O.W.T.S <br />BULL RUN <br />VALVE <br />PLAN VIEW <br />NOTES <br />1. INSTALL 2,000 GALLON, TRAFFIC -RATED P&L CONCRETE SEPTIC TANK IN LOCATION <br />TO MAINTAIN AREA FOR 100' LEACHLINES. THIS WILL BE APPROXIMATELY THE CENTER, <br />N <br />NORTH OF THE NEW BUILDING. CONNECT INFLUENT LINE TO SOUTH SIDE OF TANK Z <br />AND DEEP ENOUGH TO MAINTAIN 1' OF SOIL COVER, U <br />2. INSTALL ZOELLER BULL RUN VALVE TO TIGHTLINE EXITING SEPTIC TANK WITH >mVALVE SET TO PRIMARY LEACHLINE. W <br />3. CONNECT B" DIA, X 10' EZ FLOW MODULES AS ILLUSTRATED, CONSTRUCT BOTH U <br />PRIMARY AND REPLACEMENT LEACHLINES, W/ 1' DIRT SEPARATION. N= 120 MODULES <br />4. INSTALL OBSERVATION "T" AT ENDS OF EAST LEACHLINES WITH THREADED CAPS <br />WITHIN CHRISTY BOXES, AS NOTED, <br />5. SAWCUT CONCRETE SLAB, 4" WIDE. CONNECT 4" EZ FLOW PIPE WITH 4" TO 3" <br />REDUCER. CONNECT 3" DIA, SCH, 40 PVC TIGHTLINE TO CONNECT TO WEST LEACHLINES, <br />6. INSTALL WEST LEACHLINES IDENTICAL TO EAST LEACHLINES, INSTALL FILTER <br />FABRIC OVER ALL MODULES = 12000 SF. <br />7. BACKFILL LEACHLINES W/ MIN, 1' NATIVE SOIL COVER AND MATCH SURROUNDING GRADE, <br />8. CONNECT WEST PRIMARY AND REPLACEMENT LEACHLINES WITH "T" AS NOTED. <br />9. DRILL 4' X 25' SEEPAGE PIT 5' FROM END OF WEST LEACHLINES, <br />10. CONNECT LEACHLINE "T" TIGHTLINE W/ 4" RISE TO 4" DIA, <br />SEEPAGE PIT PIPE. <br />w <br />ae <br />w <br />;a� <br />zxc� <br />W <br />Y <br />v <br />m <br />U <br />p <br />p <br />m <br />o <br />r <br />