GENERAL <br />1. permit is not valid unless signed by the Department Director or his authorized representative. This permit is <br />transferable and is void if work is not completed prior to expiration date. An extension may be granted if such is requested forty-eight (48) hours <br />before permit <br />2. OF PROVISIONS - It is understood and agreed by the permittee that the performing of any work under the permit shall constitute <br />acceptance of the <br />3.KEEP PERMIT AT The permit and control number shall be kept on the jobsite and shall be shown to any of the City <br />verification of permit <br />4. AND A minimum of 24 hours notice shall be required prior to placing any backfill, connection to any existing facility, or <br />placement of any concrete or asphalt paving. Inspection shall not be deemed a waiver on the part of the City of the right to demand correction of <br />at a subsequent <br />5. PLANS AND work shall conform to the City of Stockton Standard Plans and <br />6.SURVEY MONUMENT Any monuments including, but not limited to, chisel crosses, witness corners, and iron pins that control <br />location of tracts, property lines, roads, streets, or provide survey controls, and that may be disturbed or destroyed <br />shall be referenced by a licensed land surveyor and reset in the surface of the new construction or set a permanent witness <br />Corner records or Records of Survey shall be filed as required. (California Business and Professions Code 8771 and California Streets and <br />Code 732.5, 1492.5, <br />7.MINIMUM WITH AND OF work shall be planned and carried out so there will be the least <br />to the traveling public. Placing of lights, warning signs and other safety devices required for public safety shall be <br />of the permittee. All work-zone traffic controls shall be In accordance with the most current revision of Chapter 5 of the State of <br />Department of Transportation Traffic <br />8. WORKING All work shall be restricted hours between and except on arterials and collectors where <br />work is limited to the hours between and unless otherwise noted on this <br />9.TO COMPLY WITH The permittee agrees to reimburse the City for performing all work and furnishing all materials <br />correct any failure to comply with these provisions, as well as all applicable City Ordinances and Standard Plans and Specifications currently in <br />OF UTILITY The permittee shall notify utility companies 48 hours prior to beginning any construction, which may <br />or overhead facilities and will pay all expenses for any removal or relocation necessary. Valves on water mains may not be turned off <br />of the utility company <br />11. OF POLICE, FIRE AND PUBLIC WORKS When streets are to be blocked, the Police, Fire and Public <br />are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered. Access to fire hydrants shall be at all <br />times. Streets will not be closed without prior approval of City Traffic and Permit <br />12.OF The permittee will remove any refuse material from the jobsite within three days after completion of the <br />13.D to pay any delinquent bill accrued under any previous permit issued by the Department will be cause rendering the <br />applicant ineligible for any other permit from the issuing Department until such bill is <br />MEETING EXISTING The permittee shall be responsible for meeting all adjacent frontage improvements such as paving and <br />PARKING METER AND TRAFFIC SIGN The permittee shall contact either the Traffic Supervisor at (209) or Senior <br />Public Works Supervisor at (209) 937-8381 of the Public Works Traffic Devices Section, at least 48 hours prior to any parking meter or traffic <br />MANDATORY Encroachment Permit <br />To provide a more efficient and economical inspection service for Encroachment Permit construction, the following procedure shall be followed by all <br />1. Call the Permit Engineer at (209) 937-8366 to obtain a control number, no less than 24 hours, but not in excess of 72 hours prior to the start of <br />and prior to any required inspections as identified below. If work does not begin within 72 hours of the issuance of a control number, the <br />number will be invalid and the permittee shall call for a new control number. (For City Capital Projects or subdivision <br />permittee shall contact the assigned City Project Engineer at (209) 937-8411 for specific instructions prior to the beginning of any <br />2.Discuss with the Permit Engineer or inspector any unusual or difficult features of the <br />3.Advise Permit Engineer or inspector of name and phone number of contact person for the project prior to beginning <br />4.Notify Permit Engineer or inspector one day in advance to cancel a scheduled Inspection or to request an additional or earlier <br />5.Notify Permit Engineer or inspector upon completion of construction at (209) <br />REQUIRED <br />Listed below are several types of construction and points at which inspections must be made, prior to continuing construction operation. <br />continuance of construction beyond an inspection point may result in rejection of all <br />1.Grade and excavate before <br />2.Forming before placement of <br />3.Beginning and during asphalt <br />4.Cleanup and final <br />PIPE INSTALLATION: <br />1.Excavating and <br />2.Pipe Installation and/or utility <br />3.Backfill (compaction test may be <br />4.Beginning and during asphalt <br />5.Final