Laserfiche WebLink
CA <br />FCO <br />TW <br />COMPRESSED AIR <br />OVERFLOW DRAIN LEADER <br />ROOF DRAIN LEADER <br />BALL VALVE <br />GLOBE VALVE <br />CLEANOUT / WALL CLEANOUT <br />SURFACE / FLOOR CLEANOUT <br />HOSE BIBB (HB) <br />GAS COCK <br />UNION (DIELECTRIC) <br />CHECK VALVE <br />GATE VALVE (SHUT OFF) <br />OVER FLOW DRAIN <br />ROOF DRAIN (R.D.) <br />FLOOR DRAIN (F.D.) <br />FLOOR SINK (F.S.) <br />CONDENSATE DRAIN <br />TEMPERED WATER <br />NATURAL GAS <br />HOT WATER RETURN (HWR) <br />HOT WATER (HW) <br />COLD WATER (CW) <br />VENT LINE (V) <br />SOIL WASTE LINE (W) <br />DESCRIPTIONSYMBOL <br />PLUMBING SYMBOLS LEGEND <br />*** ALL SYMBOLS ON LEGEND MAY NOT APPLY TO DRAWING(S). *** <br />DESCRIPTIONSYMBOL <br />POINT OF CONNECTION <br />VENT THRU ROOF <br />BUTTERFLY VALVE <br />PRESSURE REDUCING VALVE <br />SC0 <br />CO WCO <br />NOTE:ALL SPECIFICATIONS MAY NOT APPLY <br />SCOPE OF WORK <br />1.ALL WORK REQUIRED CONSISTS OF PERFORMING ALL LABOR AND FURNISHING ALL MATERIALS, FIXTURES AND <br />EQUIPMENT REQUIRED TO PROVIDE COMPLETE PLUMBING INSTALLATION AS INDICATED ON THE DRAWINGS. IT SHALL <br />FURTHER INCLUDE FURNISHING AND INSTALLING ALL MISCELLANEOUS ITEMS REQUIRED FOR THE OPERATION OF THE <br />SYSTEMS, WHETHER SPECIFICALLY CALLED FOR OR NOT. CONNECT ALL EQUIPMENT FURNISHED UNDER OTHER <br />TRADES AS REQUIRED. DETERMINE IN ADVANCE THE SHUT-DOWN OF EXISTING UTILITIES. <br />2.EXACT LOCATION OF PLUMBING FIXTURES SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS. <br />3.PIPING SHALL BE CONCEALED ABOVE CEILINGS, IN PARTITIONS OR FURRED SPACES, UNLESS OTHERWISE NOTED. ALL <br />SERVICES SHALL RUN OVERHEAD WHERE POSSIBLE. PROVIDE ACCESSIBLE VALVES IN THE SERVED AREA. <br />4.ALL SYSTEMS SHALL BE COMPLETE AND FULLY OPERATIONAL. ACCEPTANCE BY THE OWNER SHALL BE A CONDITION <br />OF THE CONTRACT. <br />5.SPECIAL INSPECTIONS: WHERE THE PLANS INDICATE SPECIAL INSPECTIONS AND REPORT, OR AS REQUIRED BY THE <br />AUTHORITY HAVING JURISDICTION (AHJ), THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, HIRE AN INDEPENDENT <br />THIRD PARTY INSPECTOR OR TESTING AGENCY TO PERFORM THE REQUIRED INSPECTIONS FOR THE TYPES OF WORK <br />REQUIRED OR IDENTIFIED ON THE SPECIAL INSPECTION FORM. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL <br />SIGNED REPORT TO THE REGISTERED DESIGN PROFESSIONAL ENGINEER, PROVIDING TEST RESULTS AND STATING <br />WHETHER THE ITEMS REQUIRING SPECIAL INSPECTION WERE IN COMPLIANCE WITH THE INSPECTION REQUIREMENTS. <br />PROVIDE ADDITIONAL COST FOR ENGINEER'S SEALED LETTER OF APPROVAL. <br />CODES AND PERMITS <br />1.ALL MATERIALS, EQUIPMENT AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, RULES AND <br />REGULATIONS OF THE AUTHORITY HAVING JURISDICTION AND AS REQUIRED BY CITY, COUNTY, STATE AND FEDERAL <br />REQUIREMENTS. <br />2.THIS CONTRACTOR SHALL PAY FOR ALL PERMITS, LICENSES AND FEES REQUIRED BY CITY, STATE AND LOCAL <br />AUTHORITIES. <br />3.COMBUSTIBLE MATERIALS SHALL NOT BE USED IN A NON-COMBUSTIBLE CONSTRUCTION TYPE BUILDING AS DEFINED <br />BY THE BUILDING CODE. COMBUSTIBLE MATERIALS SHALL BE PROTECTED AS SPECIFIED BY THE ENGINEER AND <br />ARCHITECT OF RECORD. <br />4.PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANEL BOARDS OR SWITCHGEAR PER NATIONAL ELECTRICAL <br />CODE ARTICLE 384. <br />INSPECTION <br />1.FURNISH OWNER WITH CERTIFICATE OF INSPECTION AND APPROVAL BY LOCAL AUTHORITIES PRIOR TO FINAL <br />ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL WORK MUST BE INSPECTED. <br />2.CONTRACTOR SHALL MAKE FINAL INSPECTION AND TESTS IN THE PRESENCE OF THE OWNER AND SHALL SUPPLY ALL <br />LABOR, MATERIALS, INSTRUMENTS, AND EQUIPMENT REQUIRED FOR TESTING. <br />ACCESSIBILITY <br />1.THE INSTALLATION OF ALL VALVES, UNIONS, THERMOMETERS, GAUGES, OR OTHER INDICATING OR RECORDING <br />DEVICES, OR SPECIALITIES REQUIRING FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, REMOVAL, OR <br />REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED BUILDING. <br />2.ACCESS PANELS SHALL BE PROVIDED FOR ALL CONCEALED VALVES OR OTHER EQUIPMENT. <br />3.THE INSTALLATION OF ALL PLUMBING PIPING IN CONCEALED AREAS SHALL BE APPROVED BY THE OWNER AND <br />ARCHITECT/ENGINEER PRIOR TO CONCEALMENT. ALL PLUMBING PIPING SHALL REMAIN UNCONCEALED UNTIL THE <br />PLUMBING CONTRACTOR RECEIVES NOTIFICATION FROM ARCHITECT/ENGINEER TO PROCEED. <br />PIPE INSTALLATION <br />1.INSTALL PIPING TO BEST SUIT FIELD CONDITIONS, COORDINATE LAYOUT OF PIPING WITH DUCT WORK AND OFFSET <br />PIPING AS REQUIRED TO CLEAR NEW WORK. <br />2.ALL VENTS THROUGH ROOF SHALL BE MINIMUM 10'-0" REMOVED FROM ALL AIR INTAKES, EVAPORATIVE COOLERS, ETC. <br />3.CONTRACTOR SHALL ROUGH-IN ALL WASTE AND SUPPLY PIPING TO SPECIAL EQUIPMENT ACCORDING TO <br />MANUFACTURERS SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. <br />4.A WATER-HAMMER ARRESTOR SHALL BE INSTALLED WHERE QUICK-CLOSING VALVES ARE UTILIZED. INCLUDES TOILET <br />FLUSH VALVE GROUPS AND CONNECTIONS TO ALL SOLENOID ACTIVATED VALVES. WATER-HAMMER ARRESTORS SHALL <br />BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND SHALL CONFORM TO ASSE 1010. <br />5.PROVIDE MEANS OF PREVENTING DISSIMILAR METAL CONTACT BETWEEN ALL PIPING MATERIALS FROM ANY OTHER <br />METAL OR STRUCTURAL MEMBER TO PREVENT GALVANIC ACTION BETWEEN THE TWO METALS. <br />6.WHEN WATER PIPE AND SEWER ARE LAID PARALLEL TO EACH OTHER, ONE OF THE FOLLOWING PROCEDURES MUST BE <br />FOLLOWED: <br />6.1.THE HORIZONTAL DISTANCE BETWEEN THE WATER PIPE AND SEWER SHALL NOT BE LESS THAN SIX (6) FEET. <br />6.2.EACH LINE SHALL BE LAID IN A SEPARATE TRENCH, OR IN BETWEEN FILLED WITH COMPACT FILL. <br />6.3.THE WATER SERVICE PIPE MAY BE PLACED IN THE TRENCH WITH THE BUILDING DRAIN AND/OR BUILDING SEWER, <br />PROVIDED THE BOTTOM OF THE WATER SERVICE PIPE, AT ALL POINTS SHALL BE AT LEAST TWELVE (12) INCHES <br />ABOVE THE TOP OF THE SEWER LINE, AND SHALL BE PLACED ON A SOLID SHELF EXCAVATED AT ONE SIDE OF THE <br />COMMON TRENCH. <br />6.4.WATER SERVICE AND SEWER SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING AND <br />PRESSURE TESTED TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. <br />COORDINATION <br />1.CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS. COORDINATE WORK <br />WITH ALL TRADES TO AVOID INTERFERENCE. INSTALLED PLUMBING WORK WHICH INTERFERES WITH THE WORK OF <br />OTHER TRADES DUE TO LACK OF COORDINATION SHALL BE RE-INSTALLED AT NO ADDITIONAL COST TO THE OWNER. <br />2.ALL CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH OTHER TRADES AFFECTED BY EACH <br />OTHERS WORK AND FOR CUTTING AND REFINISHING OF EXISTING WALLS, FLOORS, SOLID AND SUSPENDED CEILINGS <br />ETC., WHERE REQUIRED BY WORK SHOWN AND NOTED HEREIN. <br />3.INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. ITEMS SUCH AS PIPE, <br />FITTINGS, ETC., SHALL NOT BE INSTALLED IN CONFLICT WITH EQUIPMENT. COORDINATE ALL CUTTING AND PATCHING <br />WITH THE GENERAL CONTRACTOR. <br />4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF HIS WORK. OBTAIN WRITTEN PERMISSION <br />OF ARCHITECT BEFORE PROCEEDING WITH ANY CUTTING OR PATCHING OF STRUCTURAL SYSTEMS. <br />CLEANUP <br />1.REMOVE AS MUCH DIRT AND DEBRIS AS POSSIBLE, AT THE END OF EACH WORKING DAY TO PREVENT HAZARDOUS <br />CONDITIONS AND EXCESS DUST. <br />ORDER OF PRECEDENCE OF DOCUMENTS <br />1.SHOULD A CONFLICT ARISE BETWEEN CONSTRUCTION DOCUMENTS, THE ORDER OF PRECEDENCE SHALL BE: <br />1.1.SPECIAL PROVISIONS <br />1.2.GENERAL PROVISIONS <br />1.3.SPECIFICATIONS <br />1.4.DETAILS ON DRAWINGS <br />1.5.PLAN DRAWINGS <br />2.THE ENGINEER OF RECORD SHALL BE NOTIFIED BEFORE A DECISION IS MADE. <br />GENERAL NOTES <br />1.2019 CPC, STATE CODES & CITY HAVING JURISDICTION AMENDMENTS. ALL SYSTEMS SHALL BE IN COMPLIANCE WITH <br />THE ABOVE CODES AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. <br />2.EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR APPROVAL, IN <br />ACCORDANCE WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND THIS <br />CODE. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE AT THE TIME OF <br />INSPECTION PER THE PLUMBING CODE. <br />3.MATERIALS EXPOSED WITHIN PLENUMS SHALL HAVE A FLAME SPREAD RATING INDEX OF NOT MORE THAN 25 AND A <br />SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE TO ASTM E84. <br />4.ALL MATERIALS INSTALLED WITHIN PLENUMS SHALL CONFORM TO THE 2019 CALIFORNIA PLUMBING CODE. <br />CODE INFORMATION <br />P1.0 <br />PLUMBING <br />SPECIFICATIONS <br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.20.09.30 BID CLARIFICATION SBW <br />20.11.18 FUEL CANOPY SHIFT SBW <br />R <br />ENGINEERING, INC <br />OBISON <br />19401 40TH AVE W., SUITE 302 <br />LYNNWOOD, WA 98036 <br />206-364-3343 tel <br />CONTACT: MARK MANGLICMOT <br />5/14/21 <br />-