CA
<br />FCO
<br />TW
<br />COMPRESSED AIR
<br />OVERFLOW DRAIN LEADER
<br />ROOF DRAIN LEADER
<br />BALL VALVE
<br />GLOBE VALVE
<br />CLEANOUT / WALL CLEANOUT
<br />SURFACE / FLOOR CLEANOUT
<br />HOSE BIBB (HB)
<br />GAS COCK
<br />UNION (DIELECTRIC)
<br />CHECK VALVE
<br />GATE VALVE (SHUT OFF)
<br />OVER FLOW DRAIN
<br />ROOF DRAIN (R.D.)
<br />FLOOR DRAIN (F.D.)
<br />FLOOR SINK (F.S.)
<br />CONDENSATE DRAIN
<br />TEMPERED WATER
<br />NATURAL GAS
<br />HOT WATER RETURN (HWR)
<br />HOT WATER (HW)
<br />COLD WATER (CW)
<br />VENT LINE (V)
<br />SOIL WASTE LINE (W)
<br />DESCRIPTIONSYMBOL
<br />PLUMBING SYMBOLS LEGEND
<br />*** ALL SYMBOLS ON LEGEND MAY NOT APPLY TO DRAWING(S). ***
<br />DESCRIPTIONSYMBOL
<br />POINT OF CONNECTION
<br />VENT THRU ROOF
<br />BUTTERFLY VALVE
<br />PRESSURE REDUCING VALVE
<br />SC0
<br />CO WCO
<br />NOTE:ALL SPECIFICATIONS MAY NOT APPLY
<br />SCOPE OF WORK
<br />1.ALL WORK REQUIRED CONSISTS OF PERFORMING ALL LABOR AND FURNISHING ALL MATERIALS, FIXTURES AND
<br />EQUIPMENT REQUIRED TO PROVIDE COMPLETE PLUMBING INSTALLATION AS INDICATED ON THE DRAWINGS. IT SHALL
<br />FURTHER INCLUDE FURNISHING AND INSTALLING ALL MISCELLANEOUS ITEMS REQUIRED FOR THE OPERATION OF THE
<br />SYSTEMS, WHETHER SPECIFICALLY CALLED FOR OR NOT. CONNECT ALL EQUIPMENT FURNISHED UNDER OTHER
<br />TRADES AS REQUIRED. DETERMINE IN ADVANCE THE SHUT-DOWN OF EXISTING UTILITIES.
<br />2.EXACT LOCATION OF PLUMBING FIXTURES SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS.
<br />3.PIPING SHALL BE CONCEALED ABOVE CEILINGS, IN PARTITIONS OR FURRED SPACES, UNLESS OTHERWISE NOTED. ALL
<br />SERVICES SHALL RUN OVERHEAD WHERE POSSIBLE. PROVIDE ACCESSIBLE VALVES IN THE SERVED AREA.
<br />4.ALL SYSTEMS SHALL BE COMPLETE AND FULLY OPERATIONAL. ACCEPTANCE BY THE OWNER SHALL BE A CONDITION
<br />OF THE CONTRACT.
<br />5.SPECIAL INSPECTIONS: WHERE THE PLANS INDICATE SPECIAL INSPECTIONS AND REPORT, OR AS REQUIRED BY THE
<br />AUTHORITY HAVING JURISDICTION (AHJ), THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, HIRE AN INDEPENDENT
<br />THIRD PARTY INSPECTOR OR TESTING AGENCY TO PERFORM THE REQUIRED INSPECTIONS FOR THE TYPES OF WORK
<br />REQUIRED OR IDENTIFIED ON THE SPECIAL INSPECTION FORM. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL
<br />SIGNED REPORT TO THE REGISTERED DESIGN PROFESSIONAL ENGINEER, PROVIDING TEST RESULTS AND STATING
<br />WHETHER THE ITEMS REQUIRING SPECIAL INSPECTION WERE IN COMPLIANCE WITH THE INSPECTION REQUIREMENTS.
<br />PROVIDE ADDITIONAL COST FOR ENGINEER'S SEALED LETTER OF APPROVAL.
<br />CODES AND PERMITS
<br />1.ALL MATERIALS, EQUIPMENT AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, RULES AND
<br />REGULATIONS OF THE AUTHORITY HAVING JURISDICTION AND AS REQUIRED BY CITY, COUNTY, STATE AND FEDERAL
<br />REQUIREMENTS.
<br />2.THIS CONTRACTOR SHALL PAY FOR ALL PERMITS, LICENSES AND FEES REQUIRED BY CITY, STATE AND LOCAL
<br />AUTHORITIES.
<br />3.COMBUSTIBLE MATERIALS SHALL NOT BE USED IN A NON-COMBUSTIBLE CONSTRUCTION TYPE BUILDING AS DEFINED
<br />BY THE BUILDING CODE. COMBUSTIBLE MATERIALS SHALL BE PROTECTED AS SPECIFIED BY THE ENGINEER AND
<br />ARCHITECT OF RECORD.
<br />4.PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANEL BOARDS OR SWITCHGEAR PER NATIONAL ELECTRICAL
<br />CODE ARTICLE 384.
<br />INSPECTION
<br />1.FURNISH OWNER WITH CERTIFICATE OF INSPECTION AND APPROVAL BY LOCAL AUTHORITIES PRIOR TO FINAL
<br />ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL WORK MUST BE INSPECTED.
<br />2.CONTRACTOR SHALL MAKE FINAL INSPECTION AND TESTS IN THE PRESENCE OF THE OWNER AND SHALL SUPPLY ALL
<br />LABOR, MATERIALS, INSTRUMENTS, AND EQUIPMENT REQUIRED FOR TESTING.
<br />ACCESSIBILITY
<br />1.THE INSTALLATION OF ALL VALVES, UNIONS, THERMOMETERS, GAUGES, OR OTHER INDICATING OR RECORDING
<br />DEVICES, OR SPECIALITIES REQUIRING FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, REMOVAL, OR
<br />REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED BUILDING.
<br />2.ACCESS PANELS SHALL BE PROVIDED FOR ALL CONCEALED VALVES OR OTHER EQUIPMENT.
<br />3.THE INSTALLATION OF ALL PLUMBING PIPING IN CONCEALED AREAS SHALL BE APPROVED BY THE OWNER AND
<br />ARCHITECT/ENGINEER PRIOR TO CONCEALMENT. ALL PLUMBING PIPING SHALL REMAIN UNCONCEALED UNTIL THE
<br />PLUMBING CONTRACTOR RECEIVES NOTIFICATION FROM ARCHITECT/ENGINEER TO PROCEED.
<br />PIPE INSTALLATION
<br />1.INSTALL PIPING TO BEST SUIT FIELD CONDITIONS, COORDINATE LAYOUT OF PIPING WITH DUCT WORK AND OFFSET
<br />PIPING AS REQUIRED TO CLEAR NEW WORK.
<br />2.ALL VENTS THROUGH ROOF SHALL BE MINIMUM 10'-0" REMOVED FROM ALL AIR INTAKES, EVAPORATIVE COOLERS, ETC.
<br />3.CONTRACTOR SHALL ROUGH-IN ALL WASTE AND SUPPLY PIPING TO SPECIAL EQUIPMENT ACCORDING TO
<br />MANUFACTURERS SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED.
<br />4.A WATER-HAMMER ARRESTOR SHALL BE INSTALLED WHERE QUICK-CLOSING VALVES ARE UTILIZED. INCLUDES TOILET
<br />FLUSH VALVE GROUPS AND CONNECTIONS TO ALL SOLENOID ACTIVATED VALVES. WATER-HAMMER ARRESTORS SHALL
<br />BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND SHALL CONFORM TO ASSE 1010.
<br />5.PROVIDE MEANS OF PREVENTING DISSIMILAR METAL CONTACT BETWEEN ALL PIPING MATERIALS FROM ANY OTHER
<br />METAL OR STRUCTURAL MEMBER TO PREVENT GALVANIC ACTION BETWEEN THE TWO METALS.
<br />6.WHEN WATER PIPE AND SEWER ARE LAID PARALLEL TO EACH OTHER, ONE OF THE FOLLOWING PROCEDURES MUST BE
<br />FOLLOWED:
<br />6.1.THE HORIZONTAL DISTANCE BETWEEN THE WATER PIPE AND SEWER SHALL NOT BE LESS THAN SIX (6) FEET.
<br />6.2.EACH LINE SHALL BE LAID IN A SEPARATE TRENCH, OR IN BETWEEN FILLED WITH COMPACT FILL.
<br />6.3.THE WATER SERVICE PIPE MAY BE PLACED IN THE TRENCH WITH THE BUILDING DRAIN AND/OR BUILDING SEWER,
<br />PROVIDED THE BOTTOM OF THE WATER SERVICE PIPE, AT ALL POINTS SHALL BE AT LEAST TWELVE (12) INCHES
<br />ABOVE THE TOP OF THE SEWER LINE, AND SHALL BE PLACED ON A SOLID SHELF EXCAVATED AT ONE SIDE OF THE
<br />COMMON TRENCH.
<br />6.4.WATER SERVICE AND SEWER SHALL BE CONSTRUCTED OF MATERIALS APPROVED FOR USE WITHIN A BUILDING AND
<br />PRESSURE TESTED TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING.
<br />COORDINATION
<br />1.CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS. COORDINATE WORK
<br />WITH ALL TRADES TO AVOID INTERFERENCE. INSTALLED PLUMBING WORK WHICH INTERFERES WITH THE WORK OF
<br />OTHER TRADES DUE TO LACK OF COORDINATION SHALL BE RE-INSTALLED AT NO ADDITIONAL COST TO THE OWNER.
<br />2.ALL CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH OTHER TRADES AFFECTED BY EACH
<br />OTHERS WORK AND FOR CUTTING AND REFINISHING OF EXISTING WALLS, FLOORS, SOLID AND SUSPENDED CEILINGS
<br />ETC., WHERE REQUIRED BY WORK SHOWN AND NOTED HEREIN.
<br />3.INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. ITEMS SUCH AS PIPE,
<br />FITTINGS, ETC., SHALL NOT BE INSTALLED IN CONFLICT WITH EQUIPMENT. COORDINATE ALL CUTTING AND PATCHING
<br />WITH THE GENERAL CONTRACTOR.
<br />4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF HIS WORK. OBTAIN WRITTEN PERMISSION
<br />OF ARCHITECT BEFORE PROCEEDING WITH ANY CUTTING OR PATCHING OF STRUCTURAL SYSTEMS.
<br />CLEANUP
<br />1.REMOVE AS MUCH DIRT AND DEBRIS AS POSSIBLE, AT THE END OF EACH WORKING DAY TO PREVENT HAZARDOUS
<br />CONDITIONS AND EXCESS DUST.
<br />ORDER OF PRECEDENCE OF DOCUMENTS
<br />1.SHOULD A CONFLICT ARISE BETWEEN CONSTRUCTION DOCUMENTS, THE ORDER OF PRECEDENCE SHALL BE:
<br />1.1.SPECIAL PROVISIONS
<br />1.2.GENERAL PROVISIONS
<br />1.3.SPECIFICATIONS
<br />1.4.DETAILS ON DRAWINGS
<br />1.5.PLAN DRAWINGS
<br />2.THE ENGINEER OF RECORD SHALL BE NOTIFIED BEFORE A DECISION IS MADE.
<br />GENERAL NOTES
<br />1.2019 CPC, STATE CODES & CITY HAVING JURISDICTION AMENDMENTS. ALL SYSTEMS SHALL BE IN COMPLIANCE WITH
<br />THE ABOVE CODES AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION.
<br />2.EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR APPROVAL, IN
<br />ACCORDANCE WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND THIS
<br />CODE. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE AT THE TIME OF
<br />INSPECTION PER THE PLUMBING CODE.
<br />3.MATERIALS EXPOSED WITHIN PLENUMS SHALL HAVE A FLAME SPREAD RATING INDEX OF NOT MORE THAN 25 AND A
<br />SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE TO ASTM E84.
<br />4.ALL MATERIALS INSTALLED WITHIN PLENUMS SHALL CONFORM TO THE 2019 CALIFORNIA PLUMBING CODE.
<br />CODE INFORMATION
<br />P1.0
<br />PLUMBING
<br />SPECIFICATIONS
<br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.20.09.30 BID CLARIFICATION SBW
<br />20.11.18 FUEL CANOPY SHIFT SBW
<br />R
<br />ENGINEERING, INC
<br />OBISON
<br />19401 40TH AVE W., SUITE 302
<br />LYNNWOOD, WA 98036
<br />206-364-3343 tel
<br />CONTACT: MARK MANGLICMOT
<br />5/14/21
<br />-
|