My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015028
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
8849
>
2600 - Land Use Program
>
PA-2200144
>
SU0015028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:08:26 AM
Creation date
11/3/2022 2:36:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015028
PE
2632
FACILITY_NAME
PA-2200144
STREET_NUMBER
8849
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95215-
ENTERED_DATE
6/29/2022 12:00:00 AM
SITE_LOCATION
8849 S AUSTIN RD
RECEIVED_DATE
9/1/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Department of Public Works <br /> SAN JDA UIN <br /> rritY Buchman,Director <br /> - - -COUNTY— S„ <br /> was sm YOU Alex Chetley,Deputy Director—Development <br /> Kristi Rhea,Deputy Director-Administration <br /> David Toltiver, Deputy Drrectar-Operations <br /> October 2, 2023 Najee Zarif,Depu!y Director-Engirreering <br /> MEMORANDUM <br /> TO: Community Development department <br /> CONTACT PERSON: Stephanie Stowers <br /> f� <br /> FROM: Christopher Heylin, Development Services Engineer <br /> Development Services Division <br /> SUBJECT: PA-2200144; A Site Approval application to expand the existing landfill gas to <br /> energy (LFGTE) facility at the Forward Inc. landfill with a new renewable natural <br /> gas facility and pipeline_ The project includes: <br /> • A new processing and metering station on APN 181-150-08. <br /> • On-site pipeline connecting the new processing and metering station and the <br /> existing LFGTE plant and landfill flares on APN 201-060-02, crossing APN <br /> 181-150-10, 181-150-07, 201-060-0, & 201-060-05, and Little John Creek. <br /> Off-site pipelines along Newcastle Road connecting the new processing and <br /> metering station and the existing PG&E distribution pipeline at Newcastle <br /> Road and McKessen Avenue (private road). <br /> • A now PG&E compressor station on APN 177-260-47 (at the southwest <br /> corner of Pock Lane and Arch Airport Road) <br /> • Off-site pipelines along Arch Airport Road between the new PG&E <br /> compressor station and existing PG&E distribution pipeline at Pock Lane. <br /> Located on the west side of South Austin Road, 1.5 miles south of Arch Airport <br /> Read, east of Stockton. (Supervisorial District 4) <br /> OWNER: Forward Inc. APPLICANT: Ameresco f=orward RNG LLC. <br /> ADDRESS: 8846 S. Austin Road, Stockton APN: 181-150-07, -08, -09, 201-060-01, <br /> -02, -03, -05, -06 &-07 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated <br /> Flood Hazard Area designated as lone AE, AO and X. The 100-Near Flood Elevation will be <br /> approximately 1 foot NAVD 1988 <br /> Austin Road has an existing and planned right-of-way width of 60 feet. <br /> Newcastle Road has an existing and planned right-of-way width of 60 feet. <br /> 1810 East Hazelton Avenue 1 Stockton,California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> V Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.crglpubworks <br />
The URL can be used to link to this page
Your browser does not support the video tag.