Laserfiche WebLink
11/25/2020MEREDITH BRANSTAD, PLA, CA LICENSE #5122 <br />HELIX ENVIRONMENTAL PLANNING <br />I HAVE COMPLIED WITH THE CRITERIA OF THE WATER EFFICIENT LANDSCAPE <br />ORDINANCE AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER <br />IN THE IRRIGATION DESIGN PLAN. <br />ETAF CALCULATIONS <br />REGULAR LANDSCAPE AREAS <br />TOTAL ETAF X AREA 2,423 <br />TOTAL AREA 5,974 <br />AVERAGE ETAF .41 <br />AVERAGE ETAF IS LESS THAN .45, PROJECT <br />IS COMPLIANT WITH REQUIREMENTS <br />SPECIAL LANDSCAPE AREAS <br />N/A <br />DRAWN BY <br />DATE <br />SCALE <br />JOB NUMBER <br />SHEET <br />11/25/2020 <br />AS SHOWN <br />TTA-14 <br />CBH11 NATOMA STREET, SUITE 155FOLSOM, CALIFORNIA 95630(916) 365-8700 2020c7-ELEVEN #415301110 N. MAIN ST.7-ELEVEN #415301110 N. MAIN ST.IRRIGATIONWATER USE CALCULATIONS <br />REFERENCE EVAPOTRANSPIRATION (ETo): <br />51.2 <br />PROJECT TYPE: <br />NON-RESIDENTIAL ALLOWED MAX ETAF:.45 <br />ETWU=(ETo)(0.62)(ETAF* <br />LA) <br />HYDROZONE # AND <br />PLANTING <br />DESCRIPTION <br />PLANT FACTOR <br />(PF) <br />IRRIGATION <br />METHOD <br />IRRIGATION <br />EFFICIENCY <br />(IE)ETAF (PF/IE) <br />LANDSCAPE <br />AREA (SQ. <br />FT.) <br />ETAF X <br />AREA <br />ESTIMATED <br />TOTAL <br />WATER USE <br />(ETWU) <br />REGULAR LANDSCAPE AREAS <br />A3, A4, A5, A8 - LOW <br />WATER USE SHRUBS <br />AND GROUNDCOVER <br />0.3 DRIP 0.81 0.37 4,884 1,807 57,361 <br />A1, A7 - LOW WATER <br />USE TREES <br />0.3 DRIP 0.81 0.37 240 89 2,825 <br />A2, A6 - MODERATE <br />WATER USE & <br />BIOSWALE SHRUBS <br />0.5 DRIP 0.81 0.62 850 527 16,729 <br />TOTALS <br />5,974 2,423 76,915 <br />SPECIAL LANDSCAPE AREAS <br />N/A <br /> THE ETWU IS LESS THAN THE MAWA, PROJECT IS COMPLIANT WITH REQUIREMENTS ETWU 76,915 <br /> MAWA = (ETo)(0.62)(.45*LA) = (51.2)(0.62)(.45*5,974) =MAWA 85,337 <br />IRRIGATION NOTES <br />SYSTEM DESIGN: SYSTEM FEATURES ARE SHOWN DIAGRAMMATICALLY FOR GRAPHIC CLARITY. THE SYSTEM DESIGN IS BASED ON XX PSI AND XX GPM AVAILABLE AT THE <br />POINT OF CONNECTION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THESE REPORTED READINGS PRIOR TO CONSTRUCTION. IF A DISCREPANCY EXISTS BETWEEN <br />THE REPORTED AND THE FOUND READINGS THAT WILL ADVERSELY AFFECT THE OPERATION OF THE SYSTEM, CEASE CONSTRUCTION ACTIVITY AND NOTIFY THE CLIENT <br />REPRESENTATIVE AT ONCE BY TELEPHONE AND IN WRITING. THE CONTRACTOR SHALL OBTAIN AUTHORIZATION FROM THE CLIENT REPRESENTATIVE BEFORE PROCEEDING <br />WITH IRRIGATION SYSTEM INSTALLATION. IN THE EVENT A PRESSURE DISCREPANCY IS NOT REPORTED IN WRITING PRIOR TO THE START OF CONSTRUCTION, THE <br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY NECESSARY REVISIONS. <br />CODES: INSTALLATION SHALL OCCUR IN ACCORDANCE WITH ALL LOCAL CODES AND MANUFACTURER'S SPECIFICATIONS. NOTIFY THE CLIENT REPRESENTATIVE BY <br />TELEPHONE AND IN WRITING OF ANY CONFLICTS PRIOR TO CONSTRUCTION. <br />SYSTEM INSTALLATION: INSTALL IRRIGATION SYSTEM AS SHOWN ON PLAN AND CONSTRUCTION DETAILS. DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS <br />DIAGRAMMATICALLY SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES, OR DIFFERENCES IN SITE DIMENSIONS <br />EXIST THAT MIGHT NOT HAVE BEEN FORESEEN AND CONSIDERED IN THE IRRIGATION SYSTEM DESIGN. INSTALL ALL PIPING AND VALVES IN COMMON TRENCHES WHERE <br />FEASIBLE AND INSIDE PLANTING AREAS WHENEVER POSSIBLE. ALL VALVES SHALL BE LOCATED IN GROUNDCOVER/SHRUB AREAS AND INSTALLED A MAXIMUM OF 12" AWAY <br />FROM BACK OF WALKS, WALLS, OR MOWBANDS. MAINLINE SHALL BE ROUTED AT THE BACK OF WALK AS MUCH AS POSSIBLE. IF DIFFERENCES OR OBSTRUCTIONS EXIST IN <br />THE FIELD THAT WILL NOT ALLOW FOR THE INSTALLATION OF THE IRRIGATION SYSTEM AS DIAGRAMMATICALLY SHOWN, THE CLIENT REPRESENTATIVE SHOULD BE <br />INFORMED BY TELEPHONE AND IN WRITING BEFORE PROCEEDING. IN THE EVENT THAT THIS NOTIFICATION IS NOT PERFORMED, THE CONTRACTOR SHALL ASSUME FULL <br />RESPONSIBILITY FOR ANY REVISIONS AND REPAIR WORK NECESSARY. <br />TESTING: PRIOR TO BACKFILLING TRENCHES THE CONTRACTOR SHALL CHARGE THE MAINLINE AND TEST SYSTEM FOR LEAKS AND REPAIR THE MAINLINE AS NECESSARY. THE <br />CONTRACTOR SHALL ALSO TEST THE CONTROLLER AND WIRING SYSTEM TO VALVES ENSURING OPERABILITY PRIOR TO BACKFILLING TRENCHES. <br />BACKFLOW PREVENTER: LOCATE PER PLAN, AND OBTAIN APPROVAL FROM THE CLIENT REPRESENTATIVE PRIOR TO INSTALLATION. <br />CONTROLLER: THE FINAL LOCATION OF THE AUTOMATIC CONTROLLER SHALL BE APPROVED BY THE CLIENT REPRESENTATIVE PRIOR TO INSTALLATION. THE CONTRACTOR IS <br />RESPONSIBLE FOR PROVIDING CONDUIT AND WIRE FROM SECONDARY SERVICE POINT TO CONTROLLER A PER PLAN. SEE PLANS FOR ADDITIONAL INFORMATION. <br />SLEEVING: CONTRACTOR SHALL ADEQUATELY SIZE ALL SLEEVES SHOWN ON PLAN. SLEEVES SHALL BE INSTALLED AT THE NECESSARY DEPTHS PRIOR TO PAVEMENT <br />CONSTRUCTION AS SHOWN ON PLANS. SLEEVING SHALL EXTEND 12" BEYOND THE EDGE OF PAVING INTO PLANTING AREA. HAVE ENDS SEALED AND MARKED CLEARLY <br />ABOVE GRADE. IN THE EVENT THAT THE CONTRACTOR FAILS TO INSTALL THE SLEEVES AS NOTED ABOVE, ANY ADDITIONAL WORK AND COSTS TO INSTALL THE SLEEVES <br />FOLLOWING PAVEMENT INSTALLATION SHALL BE AT CONTRACTOR'S COST. <br />REMOTE CONTROL VALVES: SET PRESSURE REGULATING MODULES TO 50 PSI FOR BUBBLER SYSTEMS. <br />QUICK COUPLING VALVES: PROVIDE OWNER WITH ONE OPERATING KEY, TWO SETS OF LOCKING COVER KEYS, AND ONE HOSE SWIVEL. <br />FIELD ADJUSTMENTS: SUBSTITUTIONS OF EQUIPMENT ARE NOT ALLOWED. ALL MATERIALS SHALL BE NEW AND INSTALLED IN A WAY THAT PROVIDES A COMPLETE AND <br />EFFICIENT OPERATING SYSTEM. FIELD ADJUSTMENTS MAY BE REQUIRED TO PROVIDE OPTIMUM OPERATING EFFICIENCY -- THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CONTACTING THE CLIENT REPRESENTATIVE TO REVIEW PROPOSED FIELD ADJUSTMENTS PRIOR TO INSTALLATION. IF WRITTEN NOTIFICATION IS NOT RECEIVED AND <br />RESPONDED TO BY THE CLIENT REPRESENTATIVE THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY NECESSARY REVISIONS. <br />L-2 <br />NOTES: <br />1.WATERING TIMES ARE BASED ON WEEKLY APPLICATION RATES (IN INCHES). <br />2.THIS IRRIGATION SCHEDULE IS BASED ON A 8 HOUR WATERING WINDOW. THE IRRIGATION SYSTEM SHALL OPERATE BETWEEN 10 P.M. AND 6 A.M. <br />3.DURING THE LANDSCAPE ESTABLISHMENT PERIOD, INCREASE THE OPERATION RUN TIME BY 20%. <br />4.DUE TO UNFORESEEN SITE CONDITIONS AND WEATHER, THE IRRIGATION SYSTEM RUN TIMES MAY NEED TO BE ADJUSTED AS NECESSARY TO ENSURE THAT <br />PROPER MOISTURE IS MAINTAINED IN THE LANDSCAPE. <br />5.WATERING TIMES ARE BASED ON ANNUAL EVAPOTRANSPIRATION OF 51.2 INCHES PER YEAR, IN ACCORDANCE WITH APPENDIX A OF THE MODEL WATER <br />EFFICIENT LANDSCAPE ORDINANCE. <br />6.SET CONTROLLER SO FLOW THROUGH THE METER DOES NOT EXCEED 40 GPM. <br />IRRIGATION SCHEDULE <br />VALVE NUMBER <br />IRRIGATION <br />TYPE P.R. INCH/HR GPM WATER USE <br />WATERING INTERVAL: DAYS PER WEEK/MINUTES PER CYCLE <br />JAN <br />0.9 ETo <br />FEB <br />1.7 ETo <br />MAR <br />3.4 ETo <br />APR <br />5.0 ETo <br />MAY <br />6.5 ETo <br />JUN <br />7.5 ETo <br />JUL <br />8.0 ETo <br />AUG <br />7.1 ETo <br />SEP <br />5.2 ETo <br />OCT <br />3.3 ETo <br />NOV <br />1.6 ETo <br />DEC <br />0.9 ETo <br />A1 BUBBLER 1.7 4.0 LOW 1-3 1-5 1-10 1-15 1-19 1-22 1-24 1-21 1-15 1-10 1-5 1-3 <br />A2 DRIP 1 3.54 MODERATE 1-12 1-22 2-22 2-33 3-28 3-33 3-35 3-31 2-34 2-22 1-21 1-12 <br />A3 DRIP 1 8.01 LOW 1-7 1-13 1-27 2-20 2-26 2-30 2-32 2-28 2-21 1-26 1-3 1-7 <br />A4 DRIP 1 8.39 LOW 1-7 1-13 1-27 2-20 2-26 2-30 2-32 2-28 2-21 1-26 1-3 1-7 <br />A5 DRIP 1 2.79 LOW 1-7 1-13 1-27 2-20 2-26 2-30 2-32 2-28 2-21 1-26 1-3 1-7 <br />A6 DRIP 1 2.24 MODERATE 1-12 1-22 2-22 2-33 3-28 3-33 3-35 3-31 2-34 2-22 1-21 1-12 <br />A7 BUBBLER 1.7 2.0 LOW 1-3 1-5 1-10 1-15 1-19 1-22 1-24 1-21 1-15 1-10 1-5 1-3 <br />A8 DRIP 1 13.5 LOW 1-7 1-13 1-27 2-20 2-26 2-30 2-32 2-28 2-21 1-26 1-3 1-7 <br />A <br />TE <br />OF C A L IF O R N221HI <br />REMESRBAN <br />A <br />L <br />5 <br />AT <br />D <br />TCETI <br />H <br />C <br />R <br />AEPACSDNALDESNECI <br />LST IASignature <br />Renewal Date <br />DateD -TM. <br />7/31/2022 <br />11/25/2020