Laserfiche WebLink
DRAWN BY <br />DATE <br />SCALE <br />JOB NUMBER <br />SHEET <br />11/25/2020 <br />AS SHOWN <br />TTA-14 <br />CBH11 NATOMA STREET, SUITE 155FOLSOM, CALIFORNIA 95630(916) 365-8700 2020c7-ELEVEN #415301110 N. MAIN ST.DETAILSL-5 <br />SECTION <br />NOTES <br />1) NO SPLICES TO BE MADE BETWEEN CONTROLLER & REMOTE CONTROL VALVE UNDER 500 FEET. <br />2) PAINT CONTROLLER AND CONDUIT SUPPLY LINE TO MATCH COLOR OF BUILDING WHERE APPLICABLE. <br />3) CONFIRM LOCATION OF CONTROLLER AND WEATHER SENSOR WITH CLIENT REPRESENTATIVE PRIOR TO <br />INSTALLATION. <br />4) MOUNT WEATHER SENSOR ON SOUTH SIDE OF BUILDING WHERE IT WILL RECEIVE DIRECT RAINFALL AND HAS <br />STRONG SIGNAL STRENGTH.48" MAX., 36" MIN.GALVANIZED METAL ELECTRICAL <br />CONDUIT PER CODE (SECURE <br />TWICE TO WALL) <br />FINISHED <br />GRADE <br />CONNECT CONTROL AND COMMON <br />WIRES TO TERMINAL STRIPS IN <br />ENCLOSURE. ALLOW FOR EXPANSION <br />LOOP. <br />AUTOMATIC IRRIGATION <br />CONTROLLER, LOCKING WALL <br />MOUNT CABINET. SEE IRRIGATION <br />LEGEND FOR MANUFACTURER AND <br />MODEL NUMBER OF CONTROLLER. <br />CONTROL WIRING (AWG UF #14). SECURE TO <br />TERMINAL STRIP PROVIDED IN ENCLOSURE. <br />PROVIDE 3" DIA. PVC CONDUIT FOR WIRES. <br />EXTEND 6" BEYOND BUILDING SLAB/FOOTING. <br />WIRELESS WEATHER SENSOR, ATTACH TO BUILDING PER <br />MANUFACTURER'S SPECIFICATIONS. <br />BUILDING, SEE PLANS <br />CONTROLLER <br />N.T.S.1 <br />TRENCHING - UNDER PAVEMENT <br />N.T.S. <br />NOTES: <br />1. ALL TRENCH DEPTHS ARE MEASURED FROM TOP OF FINISH GRADE. <br />2. INSTALL PIPE WITHIN SLEEVES PER PLANS UNDER PAVING. UNLESS OTHERWISE SPECIFIED, SLEEVE SIZE SHALL BE A MINIMUM OF TWICE THE DIAMETER OF THE PIPE BEING SLEEVED. SLEEVES <br />SHALL EXTEND 1' BEYOND THE EDGE OF PAVING OR BACK OF CURB NECESSITATING THE SLEEVE. INSTALL TRACER WIRE WITH ALL MAINLINES AND WHERE PIPES ARE INSTALLED UNDER PAVEMENT. <br />3. ALL PIPE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION SPECIFICATIONS. <br />4. INSTALL PER BEDDING UNDER PIPING, WHEN SPECIFIED. <br />5. TAPE AND BUNDLE ALL WIRING AT 10' INTERVALS. TIE A 24" LOOP IN ALL WIRING AT CHANGES IN DIRECTION OF 30 DEGREES OR GREATER. UNTIE ONCE CONNECTIONS HAVE BEEN MADE. <br />6. BACKFILL TRENCHES, AFTER SYSTEM HAS BEEN CHARGED TO TEST FOR LEAKS, WITH CLEAN BACKFILL TO A DENSITY TO MATCH ADJACENT UNDISTURBED SOIL PER SPECIFICATIONS. <br />CLEAN BACKFILL 95% COMPACTION <br />UNDER ROAD BASE <br />WARNING TAPE <br />COMMON AND CONTROL WIRES <br />MAINLINE WITHIN SLEEVEPAVEMENTAND BASEDEPTHVARIES24" MINIMUM COVERUNDER ROAD BASETRACER WIRE, SEE NOTES <br />MAINLINE, PER PLAN <br />CONTROL WIRE <br />LATERAL, PER PLAN <br />AS REQUIRED <br />ASSHOWN24"6"LATERAL, PER PLAN <br />LATERAL LINE TRENCHCOMMON TRENCH <br />TRENCH UNDER PAVING <br />SECTION <br />4" <br />MIN.12"ALL PVC PIPES TO BE SNAKED <br />IN TRENCHES AS SHOWN <br />PLAN <br />2 <br />NOTE: <br />1. ALL WIRE SHALL BE TAPED AND BUNDLED EVERY TEN FEET AND SHALL BE INSTALLED PER LOCAL CODE. <br />2. VALVE BOX SHALL NOT REST ON OR TOUCH VALVE, MAINLINE AT ANY POINT. <br />MASTER VALVE <br />FINISH GRADE IN TURF OR <br />TOP OF MULCH <br />MAINLINE, PER PLANS <br />BRICK SUPPORTS (4), TYP. <br />SCHEDULE 40 PVC FEMALE <br />ADAPTER AND SCHEDULE 80 <br />PVC NIPPLE <br />VALVE BOX WITH BOLT-DOWN COVER, <br />REFER TO SPECIFICATIONS <br />WATER PROOF CONNECTOR, TYP. <br />COMPACT SOIL AROUND BOX TO <br />MATCH UNDISTURBED SOIL DENISTY <br />SCHEDULE 40 PVC FEMALE ADAPTER <br />AND SCHEDULE 80 PVC NIPPLE <br />TRACER WIRE <br />3" DEPTH 3 4" WASHED PEA <br />GRAVEL <br />MASTER VALVE <br />N.T.S. <br />TOP OF BOX FLUSH WITH TOP <br />OF MULCH <br />COILED WIRE (WRAP AROUND 1 <br />2" PIPE <br />16 TIMES)3"MIN.4 <br />MAINLINE <br />MINIMUM 18/2 WIRE TO <br />CONTROLLER. MAXIMUM WIRE <br />DISTANCE RUN OF 1000' <br />VALVE BOX <br />FINISH GRADE <br />NOTES: <br />1. INLET PIPE LENGTH OF SENSOR MUST BE MINIMUM 10X PIPE DIAMETER, <br />STRAIGHT, CLEAN RUN OF PIPE, NO FITTINGS OR TURNS. OUTLET PIPE <br />LENGTH OF SENSOR MUST BE MINIMUM 5X PIPE DIAMETER OF STRAIGHT <br />CLEAN RUN OF PIPE, NO FITTINGS OR TURNS. <br />FLOW SENSOR <br />N.T.S.5 <br />10"MAINLINE DEPTHPER PLANS3"2-1/2" IN MULCH <br />USE TEFLON TAPE ON <br />THREADED FITTINGS <br />FEMALE ADAPTER, TYP <br />IRRIGATION MAINLINE <br />NIPPLE, SCHEDULE 80 <br />PVC, 18" LENGTH, TYP <br />PEA GRAVEL, 2 CUBIC <br />FEET <br />BRICK SUPPORTS, TYP. <br />OF 2 <br />COLLAR, 6" DIAMETER <br />PVC CLASS 160 PIPE, <br />LENGTH AS REQUIRED <br />FINISH GRADE <br />GATE VALVE, SEE <br />IRRIGATION LEGEND <br />PLASTIC VALVE BOX AND <br />LOCKING COVER WITH <br />BOX EXTENSIONS AS <br />REQUIRED <br />MULCH <br />GATE VALVE <br />N.T.S.6 <br />NOTES: <br />1.INSTALLATION OF TRIPLE SWING JOINTS SHALL BE AT AN ANGLE NO GREATER THAN <br />45 DEGREES TO HORIZONTAL. <br />2.ALL PRE-MANUFACTURED TRIPLE SWING JOINTS SHALL BE MANUFACTURED WITH <br />"O" RINGS AND SHALL BE RATED AT 200 PSI. <br />SECTION <br />PLAN <br />SCHEDULE 40 PVC TEE OR ELL <br />1" BRASS ELL AND 1" X 3" <br />BRASS NIPPLE (HIDDEN - SEE <br />PLAN VIEW <br />1" X 12" BRASS NIPPLE <br />1" BRASS ELL AND 1" X 3" (2) BRASS <br />NIPPLE (HIDDEN - SEE PLAN VIEW <br />1" X 12" MINIMUM LENGTH BRASS <br />NIPPLE <br />COMPACT SOIL AROUND VALVE <br />BOX TO MATCH UNDISTURBED SOIL <br />DENSITY <br />2-1/2" IN MULCHED PLANTERS <br />QUICK COUPLING <br />VALVE, PER PLANS 1" X 3" BRASS NIPPLE <br />1" X 12" MINIMUM LENGTH <br />BRASS NIPPLE <br />1" X 3" BRASS NIPPLE <br />SCHEDULE 40 PVC TEE OR ELLMAINLINE, PER PLANS <br />1" BRASS ELLS (2) <br />10" VALVE BOX WITH BOLD <br />DOWN COVER, REFER TO <br />SPECIFICATIONS <br />QUICK COUPLING VALVE <br />PER PLANS <br />#4 REBAR, 18" LONG, WITH <br />2 STAINLESS STEEL HOSE <br />CLAMPS <br />3" DEPTH OF 3/4" WASHED <br />PEA GRAVEL <br />BRICK SUPPORTS (2), TYP. <br />MAINLINE, PER PLANS 3"QUICK COUPLING VALVE <br />N.T.S.7 <br />3 BACKFLOW PREVENTER <br />N.T.S. <br />A <br />TE <br />OF C A L IF O R N221HI <br />REMESRBAN <br />A <br />L <br />5 <br />AT <br />D <br />TCETI <br />H <br />C <br />R <br />AEPACSDNALDESNECI <br />LST IASignature <br />Renewal Date <br />DateD -TM. <br />7/31/2022 <br />11/25/2020