My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Passive Soil Gas and Subslab Installation and Retrieval <br /> Standard Operating Procedure (SOP) <br /> Sampling Depth: 12-36 inches <br /> Soil Vapor Well Installation in Soil or Uncovered Surfaces: <br /> Drill a 1-inch diameter hole into the soil to desired depth. The ��-- <br /> �+; <br /> following figure illustrates it is important to get beneath the =__ ___ .4 . <br /> top soil layer to the underlying sediments below. If sample <br /> placement depth is not extended to 3ft or deeper, use a ''/z- { <br /> inch to 1-inch diameter drill bit to extend the hole to a three- <br /> to five-foot depth, as desired, to create a high permeability <br /> pathway beneath the sampler. Place 12-inch aluminum pipe . <br /> provided in the BeSure Sample Collection Kit OR longer f- <br /> inch PVC pipe (i.e. Soil Vapor Well) cut to desired length <br /> r. <br /> into the hole and insert completely. Use a tapping dowel and <br /> hammer to push pipe a '/2 to 1-inch below grade. �,,,.. <br /> Lod <br /> 1-1.5 inches Concrete seal min. 1/4-inch thickness <br /> Ground surface / Flush with grade <br /> •/ Top soil or grass <br /> Aluminum foil <br /> Blank casing <br /> 1 -inch diameter <br /> Schedule 40 PVC or aluminum <br /> Subsurface Depth: min 12-in (18cm). No max depth <br /> soil <br /> OPTIONAL <br /> For sample depths less than 36-in (1 m), <br /> advance a 1/2-inch to 1.0 inch drill hole <br /> to a min. depth of 1 meter(36 inches) <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.