My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Passive Soil Gas and Subslab Installation and Retrieval <br /> Standard Operating Procedure (SOP) <br /> Nested Multiple Depth Passive Soil Vapor Wells: <br /> Auger or drill a 3-inch diameter hole through the slab or asphalt (if present) and into the <br /> underlying soil or fill matrix to desired maximum depth. The following figure illustrates it is <br /> important to use a spacer between wells to ensure no short-circuiting or vapor pathways exist <br /> between sampling depths. Tie a 2-inch long by 1/2 to 1-inch diameter spacer with drill holes for <br /> plastic or galvanized wire ties to each of two 1"PVC pipes (i.e. vapor wells) cut to desired <br /> lengths (e.g. 4 ft and 15ft bgs). Place soil vapor well nest into the hole and insert completely. Use <br /> a tapping dowel and hammer to push pipe a 1-inch below grade and clear soil/fill around well <br /> casing to place cement and well vault in accordance with standard well vault installation <br /> procedures. <br /> 2"x2" PVC SPACER <br /> 1" DEEPER 1" SHALLOWER <br /> VAPOR PROBE 2" 1" VAPOR PROBE <br /> O <br /> LOOSE FITTING <br /> PLASTIC TIE <br /> DRILLED HOLES <br /> TIGHTLY THREADED <br /> PLASTIC TIES <br /> BENTONITE CLAY SEAL <br /> c� 1" TO 2" ABOVE <br /> z N FILTER PACK SAND <br /> n <br /> U U <br /> TOP OF #3 FILTER <br /> c� <br /> a > PACK SAND <br /> � <br /> Y Y <br /> Z Z <br /> g g <br /> m m <br /> 2' — #3 FILTER PACK SAND <br /> TOP OF SCREEN <br /> SLOTTED PVC SCREEN <br /> BENTONITE CLAY SEAL <br /> PROPOSED "SPACER" FOR <br /> NESTED SOIL VAPOR PROBE <br /> SCALE: NONE <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.