My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
View images
View plain text
Sampling and Analysis Plan for <br /> Phase II Environmental Site Assessment <br /> South Pointe Property: 701, 705, 833, 855 West Weber Avenue <br /> Stockton, California <br /> Introduction <br /> May 17, 2021 <br /> Title Name Phone Number & Responsibilities <br /> Email Address <br /> • Maintain a record of samples submitted to the laboratory, the analyses performed on each <br /> sample, final analytical results, and data validation reports. <br /> • Oversees subcontractor laboratory performance to ensure data deliverables meet project <br /> needs. <br /> Complete a project SAP and health and safety plan (HASP) prior to the start of field activities. <br /> Responsible for selection of qualified technical field staff. <br /> Responsible for oversight of field activities and ensure that procedures for field activities related <br /> to the QAPP are executed and documented properly. <br /> Contractor Field Team Corinne Ackerman 916-468-9568 0 Procure, coordinate and qualify all subcontractors. <br /> Leader (Stantec) corinne.ackerman@stantec.com Confirm that selected contractors are qualified and technically proficient to perform the scope of <br /> work assigned to them. Contractor proficiency will be ascertained by review of contractor SOPs <br /> and/or detailed discussion with contractor staff. <br /> Conduct periodic field audits on selected contractors, as warranted based on scope being <br /> performed and overall familiarity with a given subcontractor. <br /> Assuring the integrity of samples submitted to the respective laboratory. <br /> Summarizing QA/QC requirements for the project. <br /> Maintaining laboratory schedule and ensuring. that technical requirements are understood by <br /> laboratory personnel. <br /> Laboratory Quality Jared Starkey (Pace 615-773-9684 Providing technical guidance to Stantec project manager. <br /> Assurance Officer National) 'starkey@pacenational.com Ensuring accuracy of the laboratory data. <br /> Evaluating adherence to policies and ensuring that systems are in place to provide QA/QC, as <br /> defined in the QAPP. <br /> Initiating and overseeing audits of corrective action procedures. <br /> Performing data reviews. <br /> Maintaining documentation of training and certifications. <br /> �1 Project No.: 185704833.5.3&5.4 1.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).