Laserfiche WebLink
Sampling and Analysis Plan for <br /> Phase II Environmental Site Assessment <br /> South Pointe Property: 701, 705, 833, 855 West Weber Avenue <br /> Stockton, California <br /> 6.5 ACTIVE SOIL VAPOR SAMPLING................................................................................6.3 <br /> 6.6 DECONTAMINATION PROCEDURES..........................................................................6.3 <br /> 7.0 SAMPLE CONTAINERS, PRESERVATION, PACKAGING AND SHIPPING ..............7.1 <br /> 7.1 SOIL SAMPLES.............................................................................................................7.1 <br /> 7.2 SOIL VAPOR SAMPLES ...............................................................................................7.1 <br /> 7.3 PACKAGING AND SHIPPING .......................................................................................7.1 <br /> 8.0 DISPOSAL OF RESIDUAL MATERIALS......................................................................8.1 <br /> 9.0 SAMPLE DOCUMENTATION .......................................................................................9.1 <br /> 9.1 FIELD NOTES................................................................................................................9.1 <br /> 9.1.1 Field Logbooks .............................................................................................9.1 <br /> 9.1.2 Photographs and GPS Measurements.........................................................9.2 <br /> 9.2 SAMPLE LABELING ......................................................................................................9.2 <br /> 9.3 SAMPLE CHAIN-OF-CUSTODY FORMS AND CUSTODY SEALS..............................9.2 <br /> 10.0 QUALITY CONTROLS ................................................................................................10.1 <br /> 10.1 FIELD QUALITY CONTROL SAMPLES......................................................................10.1 <br /> 10.1.1 Assessment of Field Contamination (Blanks)............................................. 10.1 <br /> 10.1.2 Assessment of Field Variability (Field Duplicate or Co-located <br /> Samples) .................................................................................................... 10.2 <br /> 10.2 BACKGROUND SAMPLES .........................................................................................10.2 <br /> 10.3 FIELD SCREENING, CONFIRMATION SAMPLES, AND SPLIT SAMPLES ..............10.2 <br /> 10.4 LABORATORY QUALITY CONTROL SAMPLES........................................................10.3 <br /> 11.0 FIELD VARIANCES.....................................................................................................11.1 <br /> 12.0 FIELD HEALTH AND SAFETY PROCEDURES.........................................................12.1 <br /> 13.0 REFERENCES.............................................................................................................13.1 <br /> LIST OF TABLES <br /> Table 1-1 Key Project Personnel Contact Information and Responsibilities <br /> Table 2-1 Maximum Detected Concentrations of Constituents of Concern, Soil Matrix <br /> Table 3-3 Project-Specific Data Quality Indicators and Performance Criteria <br /> Table 3-6 Key Project Roles and Responsibilities <br /> Table 4-1 Soil Sampling Design and Rationale <br /> Table 4-4 Soil Vapor Sampling Sampling Design and Rationale <br /> Table 5-1 a Sample Summary <br /> Table 5-1 b QA/QC Sample Summary <br /> Table 5-2 Sample Containers and Preservation/Hold Time Requirements <br /> Table 6-1 Field Equipment <br /> aProject No.: 185704833.5.3&5.4 II <br />