My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ES-RR&IH-001 <br /> ® Stantec Soil Sampling SOP Page 9 of 11 <br /> Rev. 2 Jun 2016 <br /> 8.4.2 Excavation Decontamination <br /> Decontamination protocols must be carefully designed and constructed to deal with the <br /> chemicals of interest and ensure that the rinse solutions and solids are contained within <br /> the contamination reduction zone. <br /> The backhoe bucket will be decontaminated prior to excavating each excavation. The <br /> entire backhoe, bucket, and tires will be decontaminated at the conclusion of the <br /> trenching operation. Decontamination will involve using a steam cleaner with an <br /> AlconoxTM solution or pressure washer and rinsing using a steam cleaner or pressure <br /> washer with potable water. Backhoe decontamination will take place at the <br /> decontamination area located adjacent to the maintenance building or at another <br /> appropriate location. <br /> The sampling equipment will be decontaminated prior to collecting each sample. <br /> Decontamination will consist of washing the equipment with a scrub brush in a bucket <br /> with an AlconoxTM solution (or equivalent) and rinsing the equipment in a bucket filled <br /> with tap water. The date and time of decontamination of the backhoe and sampling <br /> equipment will be recorded in the field book and/or data collection forms. <br /> 8.5 Sample Containers, Storage, and Holding Times <br /> Refer to the Project Sampling and Analysis Plan (SAP) for project specific instructions on <br /> proper containers, storage of samples and allowable holding times. <br /> 9.0 QUALITY CONTROL CHECKS AND ACCEPTANCE CRITERIA <br /> Refer to the QAPP and SAP for specific quality control checks and acceptance criteria. <br /> 10.0 DOCUMENTATION <br /> A borehole log will be completed for each hollow-stem auger or direct-push borehole. <br /> The field notebook and/or data collection forms will contain the following information: <br /> • Project name and number. <br /> • Drilling company's name. <br /> • Date drilling started and finished. <br /> • Type of auger and size (ID & OD). <br /> • Type of equipment for air monitoring (PID or FID). <br /> • Air monitoring calibration and measurements. <br /> • Well completion and graphic log. <br /> • Driller's name. <br /> • Geologist's or engineer's name. <br /> THIS INFORMATION FOR AUTHORIZED COMPANY USE ONLY <br /> STANTEC CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.