Laserfiche WebLink
SAN 10AQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> ---- <br /> C 0 U NY----- SITE APPROVAL/USE PERMIT <br /> Greatness grows here. <br /> FILE NUMBER: <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> No air pollutants as result of the project <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposed project: <br /> No on-site sources of noise or vibration that may result from the proposed project <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> Drill rig used for Column Hole for Approx.4 hrs. (very minimal noise),Crane to Lift Sign into hole for 4 hrs. (very minimal noise) <br /> Might not even hear them over the existing freeway noise and traffic. <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> The project commits to a maximum ambient light output level of 0.3 footcandle at a distance of 250 feet from the billboard,as recommended by the OAAA <br /> This photo-sensor adjusts the sign well below the 65 percent of sign power during nighttime hours as required by§133(a)2 and 3 of the California Energy Code. <br /> LThe light levels emitted from the billboard would be set to adjust based upon ambient light conditions at any given time(i.e.,nighttime versus daytime) <br /> An Outdoor Advertising Permit issued by Caltrans is required for the project after County Approval. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> No on-site source of odor will result from the proposed project: <br /> Page 5 of 6 <br /> 08113/2021 <br />