My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
REMOVAL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:37:52 PM
Creation date
12/5/2022 8:30:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2022
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 0 GENERAL INFORMATION <br /> 1 . 1 INTRODUCTION <br /> This Health & Safety Plan ( HASP ) addresses those activities associated with the scope of work <br /> stated in the HASP and will be implemented by the Site Safety Officer ( SSO ) during site work . <br /> Compliance with this HASP is required of all persons and third parties who enter Innovative <br /> Construction Solutions' ( ICS ) and or subcontractors work areas . Assistance in implementing this <br /> HASP can be obtained from the SSO and Project Manager, and/or the Health and Safety Manager <br /> ( HSM ) . The content of this HASP may change or undergo revision based upon additional <br /> information made available to health and safety ( H & S ) personnel , monitoring results or changes <br /> in the scope of work . Any changes proposed must be reviewed by H & S staff and are subject to <br /> approval by the HSM , Project Manager and the CIH who approved this HASP . <br /> This site - specific HASP has been prepared for the use of Innovative Construction Solutions ( ICS ) <br /> and its employees and supplements the Health and Safety training that each ICS employee <br /> receives . The health and safety guidelines in this HASP were prepared specifically for this site . <br /> Due to the potentially hazardous nature of the site covered by this HASP and the activity <br /> occurring on the site , it is not possible to discover, evaluate , and provide protection for all <br /> possible hazards which may be encountered . This HASP is written for the specific site conditions, <br /> known at the time that this HASP was prepared , purposes, dates , and personnel specified and <br /> must be amended if these conditions change . <br /> This HASP is not intended to be used by any other contractor or personnel of any such contractor . <br /> This HASP may not address the specific health and safety needs or requirements of any other <br /> such contractor and its employees . Neither this HASP nor any part of it should be used for any <br /> other site . Subcontractors must develop their own HASP and submit it to Innovative Construction <br /> Solutions ( ICS ) Health and Safety Department for review and approval prior to commencement <br /> of work . The HASP must be e - mailed , Attention : Terry Dussault at ; tdussault@icsinc . ty <br /> ICS expressly disclaims any and all guarantees or warranties, expressed or implied , that the HASP <br /> will meet the needs or requirements of any other such contractor or its employees . ICS, <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.