My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
704
>
2300 - Underground Storage Tank Program
>
PR0547997
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 2:47:16 PM
Creation date
12/5/2022 11:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547997
PE
2351
FACILITY_ID
FA0027375
FACILITY_NAME
GRAPPA MARKET SHELL
STREET_NUMBER
704
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
25966077
CURRENT_STATUS
01
SITE_LOCATION
704 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Us ,Angeles Mmes <br /> 00) BRAWO (S) <br /> PFIO®LSM IBOLV�sD _ -- <br /> Click to Read ! <br /> Home Products Resources Distributors Representatives Company Contact <br /> BRAVO B500 Series Singlewall and Doublewall <br /> PROBLEM SOLVED <br /> TRANSITION SUMPS <br /> SIZES <br /> • Small 25 . 5" <br /> • Large 41 . 5" <br /> MATERIAL <br /> • Fiberglass <br /> • Epoxy coated galvannealed steel <br /> SPECIFICATIONS <br /> • Quality FRP construction , no need for gelcoat for chemical <br /> resistance <br /> Product Shown <br /> B501 -S " Planter" style raised lid to keep surface water out <br /> • Accommodates up to 5 factory installed AST fittings <br /> depending on model <br /> About the B500 Series Factory mounting points make a rack system installation <br /> Bravo 's B500 Series Singlewall and Doublewall transition sumps are simple <br /> compatible with all common motor fuels and can be ordered with 30-year corrosion warranty <br /> standard AST fittings pre-installed . The fittings range from electrical UL2447listed <br /> offset ( EO ) to 3" compression pass-through AST fittings . This series <br /> comes standard with positive concrete anchoring and mounting points for Doublewall construction can be monitored with vacuum or <br /> optional rack system , hydrostatically making it triennial testing exempt with <br /> continuous monitoring <br /> • Ships under a continuous 20" Hg vacuum test <br /> Optional Rack Systems <br /> Part # Description <br /> RS-501 Small rack for 11 2 or 3 vents (includes hardware ) <br /> RS-502 Large rack for 4 or 5 vents (includes hardware ) <br /> B500 Series Planter-style Singlewall <br />
The URL can be used to link to this page
Your browser does not support the video tag.