My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:17:22 PM
Creation date
1/9/2023 10:52:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231176
PE
2361 - UST FACILITY
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2701 W MARCH LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />rTest <br />. SUMP/UDC TEST —est Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />est Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />Equipment Used: ancon Tester <br />JDC ID <br />UDC 5/6 <br />UDC 7/8 <br />anufacturer <br />Bravo <br />Bravo <br />)epth (inches) <br />12 <br />1zottom <br />to Top of <br />Pipe Penetration <br />F <br />4•• <br />4••rt <br />Time <br />9:58 am <br />9:58 am <br />eading <br />1.0488 <br />1.0446 <br />Test End Time <br />10:14 am <br />'10:14 am <br />1.0486 <br />1.0445 <br />0.0002 <br />0.002 <br />0.0001 <br />0.002 <br />0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />in Reading <br />L2Finalading <br />l Criteria <br />s Test Results <br />EI Pass ❑ Fail <br />Sump/UDC ID <br />❑Pass El Fail ❑Pass ❑Fail ❑Pass <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Cril:eria <br />o vrss o <br />Ti htness Test Results ❑Pass ❑ Fail <br />i n ss resp Results <br />Additional copies of this page may be attached. <br />D Fail <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. Page 3 c <br />
The URL can be used to link to this page
Your browser does not support the video tag.