My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2023 2:37:43 AM
Creation date
1/10/2023 9:00:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fittings listed and illustrated here are common examples of what may be installed in your Bravo <br /> B -2000 series shallow steel UDC 's . In many cases entry fittings were used for pipe or conduit that they <br /> were not designed for. Read every scenario below as there are valuable tips , warnings and <br /> instructions . Some may apply broadly. Bravo does not make any requirements for which combinations <br /> are acceptable , nor does Bravo specify any heights , elevations or measurements for adjustments . <br /> FR = ES1 RETROFIT <br /> FEF - EBS CONDUIT FITTING <br /> For this fitting , remove the existing boot & clamps , clean the <br /> contact surfaces of any/all contaminants , abrade the contact <br /> surfaces of both pipes and install the FR- ES1 split FRP sleeve <br /> centered over both diameters . You can pack the interior of the <br /> steel coupler with foam cord or other material first . Then pack <br /> each half with Bravo epoxy, join them together and secure with <br /> clamps to cure . Bead with vulkem where it contacts the floor. <br /> FR = MYE = 5 RETROFIT <br /> MYERS HUB ( MYE ) CONDUIT <br /> FITTING For MYE ' s , clean the exterior of the fitting <br /> and sand the epoxy paint off of the steel floor about 1 " out <br /> from its outer diameter. Apply Bravo epoxy to interior of <br /> j FR- MYE - 5 split FRP sleeve and install over the MYE fitting <br /> with clamps . Ensure it is completely encapsulated with no <br /> .- - ' trapped air. Then apply a generous bead of vulkem to the <br /> outside of the FRP sleeve where it contacts the floor. Be <br /> sure to re-coat any steel that was exposed from sanding / <br /> cleaning . Just above it , where commonly another pipe <br /> protrudes through and a conduit comes through that pipe , <br /> follow the FR- ES1 retrofit directions above to seal these <br /> two pipes to each other. <br /> 4 <br /> BH = 1 - 1 /2 VAPOR FITTING <br /> Clean the exterior surfaces of the fitting and repeat the <br /> instructions listed above for the Myers Hub fitting . It is <br /> common for a vapor shear valve to be threaded directly <br /> onto this type of fitting . If so , then the FR- MYE-5 should <br /> apply, but if there is a nipple above , then the FR- ES1 may <br /> also be needed . It is detailed below and shown on the left . <br /> In the case where this fitting was instead used as a conduit <br /> entry, ( as shown ) first install the FR- ESI to the top - most <br /> part of the threads and the conduit that protrudes through . <br /> 2 ikB2000 - RETROFIT- KIT- 14A <br />
The URL can be used to link to this page
Your browser does not support the video tag.