Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> UNITED#5447 1 1469 E HAMMER LN, STOCKTON August 01,2023 <br /> Single-Walled Non-Pressurized Piping <br /> 404 CCR 2643(e),2661(f) Failure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair(pre-1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 115 CCR 2638(c), 2638(d) Failure to submit"Monitoring System Certification Form"within 30 days of completion of the <br /> test. <br /> OBSERVATION:Annual monitoring system certification and leak detector testing was performed on 8/2/2022 and a <br /> test report was submitted on 9/8/2022, 7 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> This is a minor violation. <br /> 116 CCR 2637.1(d), 2637.1(e)Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> OBSERVATION:Annual spill container testing was performed on 8/2/2022 and a test report was submitted on <br /> 9/8/2022, 7 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> This is a minor violation. <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:An inspection was last done on 8/2/20222 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 9/1/2022. This information was received on 9/3/2022&9/8/2022, 7 days late. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class ll. <br /> FA0001570 PR0231126 SCO01 08/01/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />