My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure WMANN.Remove all&ps and shavings gtner <br /> �- aced in steps 3 th ru 5 out of the cut end of d*;ube_ DO <br /> NOT r'emovQ chips and shavings by damping thru valve <br /> body- <br /> IWa�UppeT Tube <br /> Mar l lne] STEP 4: FU ME UPPER DWF TUBE <br /> r/ ~_Seam 5ile the upper tube sq care,and remove any burrs or <br /> Ffg�n rough edgrs. Make su re thQ Cert is flat and square. <br /> IMPORTANT;Carefully fi le a good cha mfer on the <br /> STS a: CVT THE UPPER DOP TUBE insideedge of the drop tube to provide a lead-in for the <br /> p*pak seat and inlet tube irtsWIRd in Step 8. <br /> Attach the supplied band clamp to tete upper to be just <br /> below ttre ma rk a nd em re that it Es assembled square <br /> to the Ube. The Clamp ca n be fused a5 a guide for mak- <br /> i ng a square cut. 1f a vise is used,clamp on the valve , <br /> body casting only to avoid damage to thr float and <br /> tubes(Sow fture3A). Car4pfuIly saw thmmghthe tubo f <br /> squarety,at the mark made in Step 2. Use a hacksaw <br /> with a new finwe—tooth blade. Rotating tete upper tube <br /> as the sawing progresses will minimize run out and en- <br /> sure a;qua re 90-degree cut. iiemove the band clamp <br /> after tube is tut <br /> CA -DO MW arse a pipe or t%d%Wv cu"*r to tut Fra n.rr MA"ilia <br /> er <br /> the uppdrop tube,this may damage the tuber <br /> Causing it to be out of round thereby pralsibs Onq <br /> assandify oft h*unit. <br /> noure 4 <br /> r <br /> STEP S: SAND THE UPPER DROP TUBE <br /> Sand the Inside of the drop tie with sandpaper and/or <br /> steel wool to remove all burrs and sharp edges. After <br /> sands ng wipe down the inside of the tube w4b a clean <br /> ti.., rag horn the torp to approxbnatrly 4 inches down to <br /> remove"debris. <br /> I^ <br /> j Ojai [>Y Padure to properly chomfor,san4 and <br /> aeon <br /> / the drop tube nmy a4 the sal eand result in a <br /> fallure of a pressure dear leak tool <br /> FIQrne Sat <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.